My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-04-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-04-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2012 2:45:24 PM
Creation date
4/10/2012 3:06:24 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
4/9/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9.A. - Page 4 <br /> Library circulation areas, $80,000 for increasing energy efficiency, and $175,000 <br /> for roof and HVAC equipment replacement. $500,000 is also being programmed <br /> to modify the second floor of City Hall to provide security consistent with industry <br /> standards, and to better conform our office space to meet with the organizational <br /> structure. <br /> Five new multi-million projects are being programmed in the budget: <br /> • The $5 million replacement of Fire Station 12 with a Redwood City/ San Carlos/ <br /> County combined-use facility. Funds for this design are programmed for FY <br /> 2012-13 in anticipation of construction in FY 2013-14. <br /> • A Community Wellness facility co-developed with YMCA. The $30 million facility <br /> is budgeted in FY 2015-16, with programming and design money funded in FY <br /> 2013-14 and FY 2014-15 respectively. <br /> • The Bayfront Canal Storm Retention Improvement Project, to pipe storm water to <br /> the National Wildlife Refuge Wetland Restoration area for both beneficial wetland <br /> restoration and storm water retention. This $2 million effort will begin once the <br /> Restoration Project has completed its environmental review, which will include <br /> this planned project as part of its analysis. <br /> • The storm culvert relocation at Middlefield Road will enable Block 2 to be <br /> developed to a higher potential. The relocation is estimated to cost $2 million <br /> and will take place this summer. <br /> • The replacement of synthetic turf at the Fair Oaks Elementary School field and <br /> the Red Morton campus. $300,000 is programmed for FY 2012-13 to replace turf <br /> at the Fair Oaks field with matching funds from the School District and the <br /> County. $1.2 million is programmed for the Red Morton campus for FY 2013-14 <br /> to supplement replacement covered by warranty. Staff is working with the City <br /> Attorney and the manufacturer to determine if some of these funds will be <br /> contributed by the manufacturer. <br /> Funding previously programmed in FY 2012-13 for the Redwood Shores Lagoon <br /> Dredging Project ($1 million) and the Levee FEMA Compliance Regulatory Mitigation <br /> ($600,000) will be reallocated to other projects. Dredging of key lagoon areas was <br /> completed last fiscal year, and additional dredging may be programmed for FY 2014-15 <br /> or later. The levee certification project is complete, other than minor mitigation tasks <br /> pertaining to the environmental regulatory agencies permit. <br /> ALTERNATIVES <br /> Council may choose to reprioritize proposed funding and/or make other adjustments. <br /> FISCAL IMPACT <br /> The proposed CIP budget totals $17,224,219 for FY 2012-13 and $19,399,673 for FY <br /> 2013-14. <br />
The URL can be used to link to this page
Your browser does not support the video tag.