Laserfiche WebLink
6.3. B. - Page 10 <br /> Project traffic signals and liltelligent Transportation System (ITS) equipinent during <br /> Major Traffic Incidents. <br /> C. CITY shall have the rights to view fi�ll system CCTV cainera images, during both Daily <br /> Operations and during Major Traffic Incidents. During Daily Operations both CITY and <br /> Caltrans may control PTZ(s) with priority given to the owning jurisdiction. <br /> D. CITY shall have access to view fi�ll system vehicle detection data, during both Daily <br /> Operations and during Major Traffic Incidents. Control of the vehicle detection system <br /> shall remain with Caltrans. A frameworlc to establish priority, n�les, and defaults may be <br /> developed as City deems necessary in a separate agreement between City and Caltrans. <br /> E. CITY, in its sole and absolute discretion, may opt to negotiate with Caltrans for any <br /> shared control of the directional signs during Daily Operations. <br /> F. CITY shall relinquish all control of signals, PTZ cameras, and directional signs to <br /> Caltrans during incidents. If Caltrai7s is unable to assume control of these systems due to <br /> teclulical reasons, control shall remain with CITY. <br /> G. Additional agreeinents between CITY and Caltrans and possibly other cities, may be <br /> developed as needed for operating the Project equipment located in the CITY limits <br /> during major traffic incidents. <br /> 5. Maintenance <br /> A. Upon CITY's acceptance thereof, CITY shall maintain the Upgraded Equipment located <br /> witlun CITY's right-of-way at CITY's expense. <br /> B. CITY shall assume the associated electrical costs of the Project equipment (New and <br /> Upgraded) located within CITY's right-of-way. <br /> C. Except for communication lines, C/CAG shall maintain the New Equipment for the Term <br /> of tlus Agreement. Except for communication lines, CITY shall not inaintain New <br /> Equipment for the Term of this Agreen�ent. If the New Equipment becomes obsolete or <br /> i7o longer in use, GCAG shall, at its own expense, remove such New Equipment froin the <br /> CITY's right-of-way. <br /> D. CITY sha11 address graffiti removal on the Project equipinent located within CITY's <br /> right-of-way pursuant to its Municipal Code. <br /> E. GCAG agrees to obtain a inaintenance contractor that specializes in ITS equipment. <br /> C/CAG and/or its maintenance contractor shall obtain an encroachment permit from the <br /> CITY for worlc within the CITY's right-of-way. <br /> F. GCAG or its assignee, shall serve as lead agency to adnunister the maintenance service <br /> contract and/or to oversee administration of the maintenance service contract for its <br /> Project equipment maintenance responsibility. <br /> ATTY/AGR/2012.025/SMART CORRIDORS CCAG <br /> REV:03-15-12 VR <br /> Page 4 of 7 <br />