Agmt12 Casey Construction, Inc. Pump Station 14
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Casey Construction, Inc. Pump Station 14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2012 5:02:17 PM
Creation date
4/12/2012 5:02:16 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Casey Construction, Inc.
PROJECT NAME
Sanitary Sewer Pump Station # 14 Improvements Project
RMP File Number
304
Date
4/9/2012
MO Ref
12-056
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. Liauidated Damaaes <br /> 1. City and Contractor recognize that time is of the essence of this Agreement <br /> and that City will suffer financial loss in the form of lost revenues, contract <br /> administration expenses (including project management and consultants' <br /> expenses), delay and loss of public use, if the Work is not completed within <br /> the time specified in paragraph 3.1 above plus any extensions thereof <br /> allowed in accordance with the Contract documents. Consistent with <br /> Document 00700 (General Conditions), Contractor and City agree that <br /> because of the nature of the Project, it would be impractical or extremely <br /> difficult to fix the amount of actual damages incurred by City because of a <br /> delay in completion of the Work. <br /> 2. Accordingly, City and Contractor agree that Contractor shall pay City Three <br /> thousand and 00100 Dollars ($3,000.00) for each Day that expires after the <br /> time specified in Paragraph 3.1 of this Document 00520 for Contractor to <br /> achieve Substantial Completion, until such date as contractor achieves <br /> Substantial Completion. <br /> C. Liquidated damages for delay shall only cover and be in lieu of the actual damages <br /> suffered by City as a result of delay referenced above. Liquidated damages shall <br /> not cover the cost of completion of the Work, damages resulting from defective <br /> work, cost of temporary replacement facilities, damages suffered by others who <br /> then seek to recover their damages from City (for example, delay claims of other <br /> contractors or subcontraetors), and defense costs thereof. <br /> IV. CITY'S ENGINEER AND REPRESENTATIVES <br /> Reserved <br /> V. CONTRACTOR'S REPRESENTATIONS AND WARRANTIES <br /> In order to induce City to enter into this I\qreement, Contractor makes the following <br /> representations and warranties: <br /> A. Contractor has visited the Site and has examined thoroughly and understood the <br /> nature and extent of the Work, Site, locality, actual conditions, as built conditions, <br /> and all local conditions and federal, state and local laws and regulations that in any <br /> manner may affect cost, progress, pertormance or furnishing of Work or which <br /> relate to any aspect of the design and the means, methods, techniques, sequences <br /> or procedures of construction to be employed by Contractor and safety precautions <br /> and programs incident thereto. <br /> B. Contractor has examined thoro�ghly and understood ail reports of exploration and <br /> tests of subsurface conditions, drawings or reports, available for design and <br /> construction purposes, of physical conditions, or which may be apparent at the Site <br /> and accepts the determination set forth in these documents and Document 00700 <br /> (General Conditions) of the limited extent of the information contained in these <br /> documents upon which the Contractor may be entitled to rely. Contractor agrees <br /> that except for the information so identified, Contractor does not and shall not rely <br /> on any other infortnation contained in these Sections. <br /> C. Contractor has considered the physical conditions at or contiguous to the Site or <br /> otherwise which may affect the cost, progress, pertormance or fumishing of Work, <br /> as Contractor considers necessary for the pertormance or fumishing of Work at the <br /> Contract Sum, wfthin the Contract Time and in accordance with the other terms and <br /> conditions of Contract documents, including specifically the provisions of the <br /> General Conditions. <br /> SANITARY SEWER PUMP STATION #14 IMPROVEMENTS PROJECT 2 <br />