My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-04-23
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-04-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2012 3:14:08 PM
Creation date
4/19/2012 5:48:38 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
4/23/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1. D. - Page 1 <br /> RE PO RT <br /> To the Honorable Mayor and City Council <br /> From the Cit Mana er <br /> April 23, 2012 <br /> SUBJECT <br /> Award of Contract — Pump Station # 25 and Additional Pump Station Improvements <br /> RECOMMENDATION <br /> Approve, by motion, the contract documents and award the standard form contract <br /> 00520 for the Pump Station #25 and Additional Pump Station Improvements Project to <br /> the lowest responsible bidder, Casey Construction, Inc. of Redwood City for their low <br /> bid of $153,980.00 and authorize the City Manager to increase the contract amount, if <br /> necessary, up to 10% of the amount awarded. <br /> BACKGROUND <br /> Redwood Shores currently has a total of 26 wastewater pump stations. Over the past <br /> ten years, the city has made improvements to wastewater pump stations 1, 2, 3, 10, 12 <br /> and 15 to improve the pumping efficiency, ease of operation, and safety of the facility. <br /> Pump stations are selected for improvements after Engineering and Public Works <br /> Services staff evaluates the condition of the existing facilities. As well as the overall <br /> functionality of the pump station, the evaluation includes issues of safety, maintenance <br /> and operation efficiency, and the ability of the facility to perform in emergency <br /> conditions. <br /> Wastewater Pump Station No. 25 was constructed in 1997, by the developer, specifically <br /> for the flows generated from the Westport Office Park. The pump station is located near <br /> the intersection of Bridge Parkway and Island Drive. The wastewater from the pump <br /> station is pumped along Island Boulevard and terminates at Pump Station No. 11. <br /> ANALYSIS <br /> Improvements at Pump Station 25 will include removing the failing PVC lining inside the <br /> wet well. The flexible coupling vault next to the pump station wet well has settled, <br /> creating a space between the wet well and vault structure. The project will mitigate the <br /> vault settlement and install flexible ball joints on the force mains. These flexible joints <br /> will allow the connections to withstand movements from future settlement and seismic <br /> activities. <br /> At another sixteen pump stations, each wet well opening will be provided with a safety <br /> grate to prevent accidental falls into the wet well. <br /> Three (3) bids were received at the bid opening on March 21, 2012, and are <br /> summarized below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.