My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt02 Harding ESE
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2002
>
Agmt02 Harding ESE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2008 9:02:40 AM
Creation date
4/9/2002 1:26:33 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Harding ESE
PROJECT NAME
Groundwater contamination - El Camino Real Area
RMP File Number
304
Date
4/3/2002
MO Ref
02-42
Box
6593
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Harding ESE Harding ,$,, Inc. <br /> A MACTEC COMPANY The following rates are effective 4/1/01 and will be adjusted annually on April I to rgflect merit and <br /> <br />Professional Clerical $ 52.00/hour <br />and Technical Technical Word Processor 57.00Paour <br />Services Field Technician 57.00/hour <br /> Senior Field Technician 67.00/hour <br /> Drafter/CAD Operator 67.00/hour <br /> Project Adminiatrator/Proiect Coordinator 67.00/hour <br /> Technical Editor 67.00/hour <br /> Staff Engineer and Scientist 76.00/hour <br /> Project Eno_ineer and Scientist 88.00/hour <br /> Senior Engineer and Scientist 113.00/hour <br /> Associate Engineer and Scientist 132.00/hour <br /> Princil~al En~_ineer and Scientist 151.00/hour <br /> Consulting Vice President 180.00/hour <br /> <br />Contract Labor From time to time, Harding ESE, Inc., retains outside Professional and Technical labor on a temporary <br /> basis to meet peak work load demands. Such contract labor will be charged at regular Schedule of <br /> Charges rotes. <br /> <br /> Litigation Expert testimony in depositions, hearings, mediation, and trials will be charged at 200% of the <br /> Support above rates. <br /> <br /> Travel Time Travel time will be charged at regular hourly rates, for actual time involved (8-hour maximum). <br /> <br /> Equipment CADD/Microcomputer $ 25.00/hour <br /> Personal Computer 25.00/bout <br /> Truck and Field Test Equipment 15.00/hour <br /> 4-Whccl Drive Truck 15.00/hour <br /> 1/2- to 1-Ton Pickup Truck 10.00/hour <br /> Automobile 0.35~mile <br /> Geonhvsical Efluipment Separate Schedule <br /> Geotechnical & Environmental Monitoring Equipment Separate Schedule <br /> Other Computer Services Separate Schedule <br /> <br /> Outside Rental of equipment not ordinarily furnished by Harding ESE, Inc., <br /> Services and all other costs such as special printing, photographic work. travel by <br /> common carrier, subsistence, subcontractors, etc. cost + 15% <br /> <br /> Communication In-house costs for long-distance telephone, telex, telecopier, postage, project labor <br /> & Reproduction and printing, charges x 5% <br /> <br /> Terms Billings are payable upon presentation and am past due 30 days from invoice date. A finance charge of <br /> 1.5 percent per month, or the maximum amount allowed by law, will be charged on past-due accounts. <br /> Harding ESE, Inc., makes no warranty, either expressed or implied, as to its findings, reconunendations, <br /> specifications, or professional advice except that they are prepared and issued in accordance with <br /> generally accepted professional practice. <br /> <br /> This fee schedule includes data that is considered confulential and shall nat be copied or otherwise disclosed <br /> beyond the use intended in this contract or proposa~ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.