My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 Structural Engineers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Under 60K
>
Agmt12 Structural Engineers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 11:45:53 AM
Creation date
5/31/2012 1:29:43 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Structural Engineers, Inc.
PROJECT NAME
Design Professional Agreement- R&R 3 rooftop HVAC units at Fire Station No. 9. Amendment #1 dated 10/30/12 adds R&R one HVAC uinit at FOCC.
RMP File Number
304.5
Date
5/29/2012
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, <br /> EXHIBIT"A" <br /> SCOPE OF SERVICES. TIME AND FEE SCHEDULES <br /> PROJECT DESCRIPTION: <br /> Removal and replacement of three roof top mechanical HVAC units at Fire Station No. 9. <br /> SCOPE OF SERVICES: <br /> Consultant shall provide structural engineering services and prepare plans and specifications, as <br /> necessary for the project. Consultant shall refer to preliminary drawings, marked as 100% check set, <br /> prepared by Encon Energy Conservation Company for this project. <br /> 1. Consultant shall prepare plans and specifications that include the following. <br /> A. Structural calculations <br /> B. Structural drawings <br /> C. Structural specifications <br /> D. Order of magnitude cost estimate, as necessary. <br /> E. Response to building department plan check comments <br /> 2. Consultant shall provide construction administration services that include the following. <br /> A. Response to Requests for Information <br /> B. Review of all shop details <br /> C. Review of deferred submittals for the structural work <br /> D. Periodic observation of the structural portions of the construction for conformance with the design <br /> intent and contract documents and pertorm at least one (1) site visit <br /> TIME SCHEDULE: <br /> Consultant shall begin work immediately upon receipt of the Notice to Proceed (NTP). <br /> Deliverable Time <br /> 95% Plans and Specifications 6 weeks after NTP <br /> 100% (unchecked) Plans and Specifications 2 weeks after 95% review <br /> Provide Final Plans and Specifications 2 weeks after 100% review <br /> FEE SCHEDULE: <br /> Consultant shall provide the services outlined above for a Lump Sum fee$3,000.00 which will be payable <br /> within 30 days following City's receipt of acceptable deliverables. <br /> Estimated reimbursables include costs of reproducing, and mailing or shipping drawings and <br /> specifications, and all fees paid to local agencies or government offices on the City's behalf. <br /> Consultant shall receive City authorization for additional site visits. Consultant shall invoice for additional <br /> site visits on an hourly basis, but not to exceed$450.00 per trip. <br /> ATTY/qGR/2012.050/STRUCTUR.4L ENGINEERS INC. <br /> REV:OS-01-12 VR <br /> Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.