My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-06-18 Special
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-06-18 Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2012 3:39:05 PM
Creation date
6/19/2012 1:35:33 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council
Date
6/18/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> 6.1. E. - Page 24 ' <br /> 3.13.2 A Befare blasting, surface im�aerfections such as sharp fins, sharp edges, weld spa�ter ' <br /> and mill or �abrxcatian marks shall be removed from the surface by the contractor. Areas ' <br /> shali be spot cleaz�.ed by pawer wire brushing or orbital sanding using 80 grit Qr finer to ' <br /> ac�ieve a smooth, contoured finish, Only stainless steel pads or abrasive sanding disks slaaIl ; <br /> be used. Abrasi�e disks used to r�move discontinuities shall not have been used previously . <br /> on other metals, ar have bee� used to remove copper pigmented paints. <br /> 3.13.2 B The required finish is achieved by a glass bead blast with the fallowing i <br /> characteristics: <br /> -Glass bead size: #$ using Designation No. AGB-18 (U.s. Sieve size 70-100), or best alternat»e/best i <br /> practice <br /> -Air pressure: 80 psi <br /> -Nozzle tip: 7/16 incl� �� <br /> -Nozzle type: ceramic , <br /> -Nozzle angle: 75 degrees to 90 degrees to the suz��ace <br /> 3.13.2 C After glass beadzng, surface iinperf�ctions that remain (e.g., sharp fins or edges. � <br /> Weld splatter and mill or fabrication marlcs) shall be removed from the surface. Tha axea � <br /> sha11 than be glass bead blasted again to insu�re continuity af �lie required satin finish. <br /> 3.13.3 The underwater portions of the hull skaall be provided with an antifouling paint system <br /> in accordance with ABYC reconr�mendations and manufacturer's directions. ! <br /> 313.4 Valves and other control devzces sha11 be clearly labeled r�ith waterproof labels to � <br /> identify tihe function of the valve. ' <br /> 3.13.5 The cab will b� unpain.ted.but with a horizontal red stripe color scherne that matches <br /> the hu1i. � <br /> 3.14 Stowa�e: � <br /> 3.14.1 All eq�iipment and quantities, listed in the below table, wzll be procuxed by the � <br /> Redwood City �'ire Department. All equipment wi11 be shipped directly to vendor. Vandor <br /> shall install and stow all equiprnent in vessel duz�i�g and/or after construction of th� �r�ssel. ' <br /> Dinlensians, vsreight, and preferred location in the vessel, to be constructed, will be identified � <br /> and shared wifh vendor by the Redwood City �'ire Departm�nt a1: the first Engrneering � <br /> Con�erence. Prior to constructions, all locations �or insta�lation/stowage of such cquipment <br /> sk�all be identified and agreed upon by the Redwood City Fire Depart�en� and vendar. <br /> Itezn Quantity � <br /> Line Gun 1 I <br /> Personal Flash Lights 4 � <br /> Rechaxgeable Light/Charger 4 , <br /> Angus Higk�-Czx�bat Lite Hose- 1 ', <br /> 50'x5" ' <br /> Angus Premier Lite Hose�50'x 4 � <br /> 2 112" � <br /> � <br /> An�us �'remier Lite Hose- 8 � <br /> Sd'x 1 3/4" � <br /> KK Nozzle 2 <br /> 1 3/4 Foam Nozzlc 2 <br /> Cellar Nozzle 2 <br /> �'oam Eductor Plumbed <br /> Doubl� Male S1;orz 2 <br /> Double female Storz 2 � <br /> Double Male 2 1/2 2 <br /> 15 ' <br /> ATTY/AGR/2012.076/METALCRAFT MARINE <br /> ; <br /> REV:06-13-12 VR <br /> � �, <br />
The URL can be used to link to this page
Your browser does not support the video tag.