<br /> 6.1. E. - Page 27 '
<br /> least one hour. All engine temperatures and oil pressures sha�l be within manufacturer's �
<br /> ;
<br /> tolerances throughout the test. Special attention will be paid to znonitaring piping, fuel ',
<br /> system, engine mounts and engix�e contrals for wealcness, leakage or failure. �
<br /> 3.15.�4 Speed Accepta�ce Test - The fiilly loaded boat r�x�.ust be capable of maintaining the �
<br /> desirad speed for two hours at 85 percent (85%) of the rated con.tz�uous horsepovver of each
<br /> engine as d�finad in these specifications. Failure to attain the desired speed, porpoising or '
<br /> head'zng instabiiit� shall be cause for rejectio�n. Speed sha11 be determined by six (6) timed :
<br /> runs (three in each direction} over a measured mile or haif mile caurse, or by global ;
<br /> positioning data, in water at least thirty (30) feet deap. During this test, engine tempexatures, '
<br /> pressures, pipiz�g and connections shall be nn.onxtored by an engine manufacturer's technical ;
<br /> representative. The main engines must nat exceed the manufacturer's certified continuous �
<br /> opexating xpm. �pecial attention wiil be paid ta monitoring piping, fuel system, en.gine �
<br /> mounts and engxne controls for wealcness, lealcage ar failur�. '
<br /> 3.15.5 Maneuvering Acceptance Test - The boat sha.Il be tested for stability and i ',
<br /> xnaa�euverabili�y in high-speed turns, and sha11 not exhibit any dangeraus or undesirable ;
<br /> handliz�.g chaxacteristics. Examples of dangerous and undesirabie handling characteristics are I
<br /> broaching, exces,�ive rolling, loss of power, loss o�r steering control, excessive wave impact '�
<br /> while underway, or excessive seepage of water into the cabinlpzlothouse ar bilge. The boat '
<br /> shall be tested far ability to make an emergency stop at ma�imurn speed by lowering i.he
<br /> reversing buckets of the r�vaterjets.
<br /> 3.15.6 Vibration Acceptarice Test - Vibration which can damage or fatigue structure, j
<br /> elect�rzca,l, machinery, piping or electronic components of the boat may result in a rejection. i
<br /> 3.15.7 Severe Weather Acce�tance Test - This test sha11 be conducted in wa��� of 3�foot '
<br /> significant height. The boat shall not exhibit undesixable or dangerous chaxacteristics.
<br /> I �
<br /> Examples of undeszrable ar dangerous handling charactexzstzcs are broaching, �xcessiva
<br /> rolling, loss o� power, loss of steering cantrol, excessive vva�e impact while underway, or '
<br /> excessive seepage o�water into the cabin/pilothouse or bzlge. The speed requirement for this '
<br /> test i� ten (10) knots.
<br /> 3.15.8 Pump Acceptanee Test � The Redwood City k'ire Department shall conduct a
<br /> j standard fire pump acceptance test that complies with NI'PA Standard 1925 guidelines.
<br /> � During these tests, engine pressures and fcmperatures shall not exceed naanufacfurer's limits.
<br /> Special attention will be paid to inonitoring piping, Fuei system, engine mounts and engine ,
<br /> controls for weaicness, �ea�cage or failure.
<br /> 3.15.9 Fittings Acceptance Test - All weather tight and watertight fittxngs and a11 structure
<br /> shall be froe Prom lealcage when exposed to a 40-psi stream from a 5/8�inch nozzle at a
<br /> distance of eightoen (i 8) inchcs. Test a�' each fitting shall be For ten (10) minutes. '
<br /> 3.15.10 Second Trial - In the event that the boat or any component a�the baat fails to meet '
<br /> any t�st requirement, second �rials shall be made at the option of The Redwood City Fire �
<br /> # Deparhnent within thirty (30} days o['the date of the f'irs1; trials. ,
<br /> - 3.15.11 Such trials shall be final and conclusive, and failure to coz�ply with th�se -
<br /> r�quiremenis i:nrough the success�ul complefion of ail te�ts sha11 be cause �or rejection, ;
<br /> , 3.16 Trainin�:
<br /> ' 3.16.1. A qu�li�'zed repr�seniative from the con.tractor sha1l pro�ide 1;raining to the Redwood ;
<br /> City Fire D�par�ment in the opexation, care and mainl;enance of the vessel and supplied
<br /> ' equipx�nent. This shall consist of �iree (3} days per shift of onsite trainin� for three (3) sl�ifts '
<br /> of firef'ighters and shall be conducted at the Port of Redwood City, Red�wood City, CA.
<br /> 3.17 Warrant,_y and Service: �
<br /> 3.17.1 Ali repairs and/ar r�placements snall be made at no cost whatsoever and to the
<br /> com�lete satisfaction a� The Redwood Cify I'ire Departmen.t for the first year. The guarantee
<br /> � sha1l not cover brealcage or daznage caused by acts of God, n�glec�, �x�isuse ar wrecicing ;
<br /> i 18 ,'
<br /> ATTY/AGR/2012.076/METALCRAFT MARINE '
<br /> , REV:06-13-12 VR