My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 Interstate Grading and Paving, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Interstate Grading and Paving, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2012 10:46:27 AM
Creation date
6/25/2012 10:45:08 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Interstate Grading and Paving, Inc.
PROJECT NAME
Shoreway-Skyway Bike Improvements Project
RMP File Number
304
Date
6/22/2012
MO Ref
12-091
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� . Aj} <br /> ORIGI�NAL <br /> AGREEMENT <br /> for the <br /> City of Redwood City <br /> SHOREWAY-SKYWAY BIKE IMPROVEMENTS PROJECT <br /> � <br /> THIS AGREEMENT, made this��day of , 201 `�,--by and between <br /> Interstate Grading and Paving, Inc. w ose place of b siness is at P O BOX 389, South San <br /> Francisco, CA 94083, hereinafter called "CONTRA OR", and the City of Redwood City, a <br /> Charter City and municipal corporation of the State of California, hereinafter referred to as"CITY". <br /> In consideration of the mutual covenants hereinafter set forth, Contractor and City agree <br /> as follows: <br /> I. WORK <br /> A. Contractor shall complete all Work specified in the Contract documents, in <br /> accordance with the Specifications, Drawings, and all other terms and conditions of <br /> the Contract documents. <br /> II. CONTRACT SUM <br /> A. City shall pay the Contractor as the "Contract Sum" for completion of Work in <br /> accordance with the Contract documents, as the amount of One Hundred Five <br /> Thousand Three Hundred Seventy Sip an,���ars �05���� computed <br /> in accordance with Contractor's Acce tec� �i a A i , 012, which <br /> �e�esa� id is inco�r 9rated herein by reference thereto as if fully set forth. <br /> B. � �O��i i �'�'�i� blla�l Z <br /> Contract Sum is all inclusive and includes all Work; all federal, state, and local <br /> r taxes on materials and equipment, and labor furnished by Contractor, its <br /> subcontractors, subconsultants, architects, engineers, and vendors or otherwise <br /> arising out of Contractor's performance of the Work, including any increases in any <br /> such taxes during the term of this Agreement; and any duties, fees, and royalties <br /> imposed with respect to any materials and equipment, labor or services. The taxes <br /> covered hereby include (but are not limited to) occupational, sales, use, excise, <br /> unemployment, FICA, and income taxes, customs, duties, and any and all other <br /> taxes on any item or service that is part of the Work, whether such taxes are <br /> normally included in the price of such item or service or are normatly stated <br /> separately. Notwithstanding the foregoing, each party shall bear such state or local <br /> inventory, real property, personal property or fixtures taxes as may be properly <br /> assessed against it by applicable taxing authorities. <br /> III. CONTRACT TIME AND LIQUIDATED DAMAGES <br /> A. Contractor shall complete the Work within the following Schedule reflecting the date <br /> the Contract Time commences to run as set forth in Section 00550 (Notice to <br /> Proceed) and Section 00700 (General Conditions); and <br /> 1. Contractor shall achieve Substantial Completion of the Work within 45 <br /> Calendar Days from the date the Contract Time commences to run. <br /> 1 <br /> SHOREWAY-SKYWAY BIKE IMPROVEMENTS PROJECT <br />
The URL can be used to link to this page
Your browser does not support the video tag.