My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord95 2087
RedwoodCity
>
City Clerk
>
Ordinances
>
1990-1999
>
1995
>
Ord95 2087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:34:35 PM
Creation date
11/18/2003 11:19:29 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Agency Type
City Council
Date
3/13/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DES:dft /21/95 (007/12) <br /> <br /> WHEREAS, in 1989 a draft supplemental environmental impact <br />report (the "SEIR"), in the form of a health risk assessment, was <br />prepared by ChemRisk, a division of McLaren Environmental <br />Engineering, which examined potential health risks related to the <br />then proposed development, and which concluded that there would <br />be no significant health risks resulting from development of the <br />Property; and <br /> <br /> WHEREAS, the United States Environmental Protection Agency <br />("EPA") conducted a site study and analysis to determine if the <br />Property should be placed on the National Priorities List under <br />the Federal Comprehensive Environmental Response, Compensation <br />and Liability Act of 1980, as amended; and <br /> <br /> WHEREAS, in 1991 the EPA concluded that the Property did not <br />qualify for federal cleanup action; and <br /> <br /> WHEREAS, in 1994, Westport submitted a revised proposal for <br />development of the Property in the form of the Project, which, in <br />comparison with the approved development described in the 1985 <br />Development Agreement results in a less dense development, less <br />visual impact, greater landscaped areas, and less vehicle traffic <br />trips; and <br /> <br /> WHEREAS, in connection with the 1994 proposal, a technical <br />addendum to the draft SEIR entitled, "Applicability of ChemRisk <br />Assessment for the Westport Site", dated June 28, 1994 (the <br />"Technical Addendum"), was prepared for the Project, which <br />concluded that, consistent with the draft SEIR, no significant <br />health risks would be created by the Project; and <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.