Consultant shall also create a hydraulic model scenario that includes up to three larger rainfall <br /> events, such as a 5-year, 24-hour storm event, a 10-year, 6-hour storm event, and a 10-year, <br /> 24-hour storm as documented through the National Oceanic and Atmospheric Administration <br /> (NOAA) Rainfall Frequency Atlas, using the Soil Conservation Service (SCS) Type I rainfall <br /> distribution curve. Con sultant shall provide a report on any new capacity issues that are created <br /> within the hydraulic model, including both modeled pipelines and pump stations, resulting from <br /> these scenarios. Consultant shall assess the amount of potential wet weather storage that <br /> would be required to assure that wet weather flows do not exceed the City's SBSA contractual <br /> flow limitations during the 10-year, 24-hour storm event. Consultant shall also begin the <br /> development of needed capacity improvements, as feasible within the not-to-exceed budget for <br /> this subtask. It is assumed that simple capacity improvements involving upsizing of a limited <br /> number of pipelines toward the downstream portion of the system can be accomplished within <br /> the proposed budget. More complex improvements such as redirecting flow, sewer relief <br /> alternatives or in-system storage will be evaluated as an Opti onal Task B. <br /> Task 2.5—Capital Improvement Proqram Update <br /> Consultant shall review and update Chapter 6 of the Master Plan to include changes from the <br /> new buildout scenario, using the 5-year storm. The update will describe the proposed capital <br /> improvement program (CIP). The update will recommend any changes to identified projects, <br /> propose new projects, adjust priorities, and document capacity improvements that have been <br /> completed since 2008. The update will use the same cost assumptions as the Master Plan, and <br /> will update all Master Plan costs to a current cost basis using Engineering News Record (ENR) <br /> construction cost i ndices. <br /> Task 2.6— Draft and Final Master Plan Amendment Technical Memorandum <br /> Consultant shall prepare a draft and final Technical Memorandum (TM) summarizing the work <br /> completed in Tasks 1 and 2. The TM will clearly define the assumptions, analyses, results, and <br /> recommendations that are produced through this Master Plan update. <br /> TIME SCHEDULE: <br /> Consultant shall provide the draft TM containing the results of the analyses within ten weeks <br /> after receiving authorization to proceed <br /> �o .ox.m. w�n..� sm r�m� u��,: w..ma <br /> � I �,� ' w. uH we �u w� - ns �. wio i. vnz v o <br /> w � • •� we v.-� n <br /> ._.�._DbUCeloPioceed � own �u.;�.:rir rx,a��x.V <br /> � PwjectMa±agement r_m�r ae�arviz tuwzmz ��._.�._ __._.��.���. �— — � T —�_�.��.� <br /> ...�...HydroulkModel�ndAlPUpdae ��e+n �m��six r�.u:m: <br /> S OataaWSystenFeHew :ar• u,�<r+.n: n�!�.��: � <br /> 5 RemewP�WfUw, sar, v.<eaw�. TKU�mi: <br /> o H)rtaukNt�lUp'ale >•�� ��,+�nz m.vin: � <br /> ...�.. P.evpwolMPCapacirylm�+avemend s.a, r..ar.n: �..•r.m: — —,� <br /> ..° . CIPUpCale =w+ vxu.umr ru.r,yc <br /> g ��nhaMFinaITM ��.s r;mxaMx rKxau ""'--- <br /> ATTY/AGR/2012.044/WEST YOST ASSOCIATES <br /> REV:06-12-12 VR <br /> Page 12 of 13 <br />