My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 TRA Environmental Sciences, Inc. MIG/TRA Environmental Services Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 TRA Environmental Sciences, Inc. MIG/TRA Environmental Services Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2016 3:44:49 PM
Creation date
7/5/2012 9:45:37 AM
Metadata
Fields
Template:
Agreement
Contractor Name
TRA Environmental Sciences, Inc. 6/2015 Now known as MIG/TRA Environental Services Inc.
PROJECT NAME
Initial Study and Mitigated Negative Declaration- water tank, pump station and pipelines proposed for the CA pressure zone in the Emerald Hills area.
RMP File Number
304
Date
6/28/2012
MO Ref
12-123, 14-104, 15-094,16-082
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GEOTECHNICAL REPORT-CORNERSTONE EARTH GROUP <br /> StaHTiUe principal Project Staff Certified Technical Technical Totai <br /> Engineer Engineer Engineer Engineering Edkor Illustretor <br /> Geolo ist <br /> Billin Rate($/hr) $200 $150 $117 $85 $80 $100 <br /> Task <br /> 1 Preliminary Geotechnical Engineering 6 12 16 34 <br /> field <br /> 2 Preliminary Geotechnical Engineering 15 2 23 12 1 8 61 <br /> office <br /> Labor Total 21 2 35 28 1 8 95 <br /> Labor Cost a4,200 3300 E4,095 52,380 $80 5800 �11,855 <br /> Expenses 55,073 <br /> Cost 516,928 <br /> Total Cost(Cost+2%*) $17,267 <br /> WATER TANK HAZARD ASSESSMENT-THE PLANNING CENTER/DCBE <br /> StaffTitle Senior Associate Graphic Clerical Totai <br /> En ineer Scientist Artist <br /> Biiling Rate(S/hr) $165 $85 $80 $60 <br /> Task <br /> 1 Prepare Tank Safety Hazard Assessment 22 6 1 1 30 <br /> Labor Total 22 6 1 1 30 <br /> Labor Cost S3,630 $510 E80 $60 $4,280 <br /> Expenses S50 <br /> Cost 3d,330 <br /> Total Cost(Cost+2%*) $4,417 <br /> CULTURAL RESOURCE REPORT-HOLMAN&ASSOCIATES <br /> StaffTiNe Principal Total <br /> Investigator <br /> Billing Rate(S/hr) $150 <br /> Task <br /> 1 Cuttural Resources Archival Research 2 2 <br /> 2 Usual Inspection of Project Site 3 3 <br /> 3 Report Preparation 3 3 <br /> Labor Total 8 8 <br /> Labor Cost 51,200 $1,200 <br /> Expenses 5300 <br /> Cost E1,500 <br /> Total Cost(Cost+2%*) 51,530 <br /> VISUAL SIMULATIONS-DYETT&BHATIA <br /> SwflTlt�e p�jncipal Urban Total <br /> Desi ner <br /> Billing Rate(Elhr) $200 $100 <br /> Task <br /> 1 Site Visit 8 8 <br /> 2 Create 3D model,landscaping and 16 16 <br /> screenin based on ro'ect lans <br /> 3 Set up model views to match selected 2 24 26 <br /> hotos <br /> 4 Create Photoshop simulations of model 2 48 50 <br /> views ouer ebstin hoto ra hs <br /> Labor Total 4 96 700 <br /> Labor Cost 5800 39,600 a10,400 <br /> Total Cost(Cost+2%*) $10,608 <br /> GRAND TOTAL PROJECT COST ;86,216 <br /> "2%mark-up of subconsultants base fee forTR.4 cordract administration. <br /> ATTY/AGR/2012.073/TRA ENVIRONMENTAL SCIENCES,INC <br /> REV:06-05-12 VR Page 25 of 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.