My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-07-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-07-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2012 9:27:35 AM
Creation date
7/5/2012 4:54:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
7/9/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.B. - Page 1 <br /> RE PO RT <br /> To the Honorable Mayor and City Council <br /> From the Cit Mana er <br /> July 9, 2012 <br /> SUBJECT <br /> Block 2/Depot Circle Project Update <br /> RECOMMENDATION <br /> Accept the report and authorize the City Manager to (1) enter into negotiations with <br /> Lowe Enterprises for the potential development of City-owned property on Winslow <br /> Street; and (2) negotiate and execute an agreement for Project Management Services. <br /> BACKGROUND <br /> On May 21, 2012, the City Council selected the development team of Hunter Storm for <br /> negotiations to build two office towers on the City-owned property generally called Block <br /> 2. As part of the Council discussion, the option was also placed before the other <br /> proposing team, Lowe Enterprises, to consider development on another City-owned or <br /> other parcels in the Downtown. <br /> The City Council acknowledged the importance of the site as a key to the future of the <br /> Downtown and the importance of the delivery of the project to continue the economic <br /> growth of the City. <br /> ANALYSIS <br /> After the Council meeting, staff inet with the ad hoc committee for direction and <br /> confirmation of Council direction. Specifically, staff confirmed that the development of <br /> the Block 2 project with office alone was acceptable, that consistent with the Council <br /> discussion the details of the buildings' design could be further vetted to assure the <br /> highest quality of construction and design, and that timely delivery of the project was <br /> important. <br /> In order to meet these expectations, staff recommends that a project manager be <br /> brought in specifically to coordinate the construction of the Block 2 office project and the <br /> Redwood Creek culvert relocation, and to ensure that the quality of the project is <br /> consistent with the Disposition and Development Agreement. Also, to further our <br /> assurances of the project's quality, both as architecture and urban design, the <br /> developer will provide a scale model of the project as approved for Schematic Design, <br /> which will be the basis for the DDA. <br />
The URL can be used to link to this page
Your browser does not support the video tag.