My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-07-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-07-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2012 9:27:35 AM
Creation date
7/5/2012 4:54:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
7/9/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.B. - Page 5 <br /> B. Liauidated Damaqes <br /> 1. City and Contractor recognize that �ime is of the essence of this Agreerr�ent <br /> and that City wi[E suffer ftnancia[ loss in the form af lost revenues, cantract <br /> admir�istration expenses {inciuding project managet�nent and consultants' <br /> expenses}, delay and Iass of public use, if the Work is not completed wi#hin ' <br /> the time speci�ed ir� paragraph IIl.A.1 above plus any extensions therep# <br /> allowed in accordance�if�the Contract documents, Consistent with Section <br /> 00700 {General Conditions), Contractor and City agree that �ecause of the <br /> nat�tre of the Project, it would f�e impracticaf or e}ctremefy difticult to �x the <br /> amount of act�aal damages incurrad �y City beca�se of a delay ir� completion <br /> nf the Wot1t. <br /> 2. Accordingly, Ci#y and Contrac#or a r�e that Contractor shall �ay City five <br /> hundred and Nol�[00 do[Iars (��}for each Day thaf expires after t�e time <br /> sp�cified in Paragraph 3.1 of this Section OD520 for Contractor#o achieve <br /> Substantial Completion, urttil such date as co�tractor achieves Substantial <br /> Completior�. <br /> C. Liq�idated damages#or delay shall oniy cover and be in lieu of the actual damages <br /> suffered by City as a result of c�elay referenced abo�e. Liquidated darnages shall <br /> not co�er the cost of complstion of the Work, ciamages resulting from defecti�e <br /> work, cos� of temparary replacement facilities, damag�s suf#ered by others w�o <br /> fhen seek to recover thei�' damages fram City (for example, de{ay cEaims of other <br /> contractors or subcantractors}, and defense costs thereof. <br /> lV. CI�Y'S ENGINEER ANO REE�R�S�NTATNES <br /> ReseEVed <br /> V, CONTRACT�R'S REPRES�NTATIONS AN�WARRAN7I�S <br /> In order to in�fuce City to enfer into this Agreement, Contractor makes #he folfavuing <br /> representations and warra�ties: <br /> I�. Con�ractor has �isited the Site anc� has exarnined thoroughly and uncEerstood the <br /> nature and extent of the Wark, Sife, locaEity, actua� conditions, as built eonditions, <br /> and aI! local canditions and federal, stat� and laca! iaws and regulations that in any <br /> mar�t�er may af�ect cast, progress, pert'ormance or furnis�ing of Work or which <br /> relate to any aspect of the design and the means, methods, techniques, sequenc�s <br /> or procedures af construction to be employed by Contractor a�d safety precautions <br /> and programs incident thereto. <br /> B. Contractor has examined thoroughly and understood al[ reports of exploration and <br /> tests of s�bsurFace conditions, drawings or reports, available for design and <br /> canstruc#ion purposes, of physical conditions, or vs+�ich may be apparent at#he 5ite <br /> and accep#s the determination set forth in these Sections and Sectian 00700 <br /> (General Conditio�s} of the limited �xt�n# af th� information conta�ned in these <br /> 5�ctions upon wi�icl� the Contractor may he entitled to rely. Cantractor agrees �hat <br /> exeept for the inforrrtatian so identified, Cor�#ractor does not and shall not rely on <br /> any otl�er information contained in these Sections. <br /> C. Cantractor has cor�sidered the physical conditions at ar contig�ous to th� Site or <br /> atherwise which may aff�ct the cost, progress, performance or f�arnishir�g of Work, <br /> as Cnntractor cansiders necessary for the perForrnance or furnishing af Work at the <br /> Contract Sut�, within the Contraet Time and in accordance with the afher terms and <br /> canditiorts of Cantract documents, including sp�cifiealEy the provisions of the <br /> General Conditions. <br /> AGREEMENT . ". ,.. ' .,. , ' ,.� 00520-2 �' , <br />
The URL can be used to link to this page
Your browser does not support the video tag.