My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-07-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-07-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2012 9:27:35 AM
Creation date
7/5/2012 4:54:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
7/9/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 62 <br /> ATTACHMENT2 <br /> e. Water system including fire hydrants with required appurtenances. <br /> f. Sanitary sewer system and appurtenant structures, laterals for each lot <br /> including such connections as are required. (Location and depth of such <br /> laterals shall be indicated on construction drawings.) <br /> g. Street tree and other street plantings which shall be installed by the City <br /> and the cost of which shall be reimbursed by the applicant. <br /> h. All communications and electrical distribution facilities, including fire alarm <br /> boxes. <br /> i. Gas distribution system. <br /> j. Street lighting system. <br /> k. The enhancement planting along Cordilleras Creek. <br /> 27.Applicant's future improvement plans shall be prepared using NAVD88 or <br /> another control datum acceptable to the City Engineer. <br /> 28.All slopes shall be shown on the plans, and finished grades shall be designed <br /> to have a minimum slope of 1%. <br /> 29.All on-site utilities shall be undergrounded. <br /> 30.Water shall be served from the existing 8" main on Finger Ave. A Public Utility <br /> Easement shall be dedicated for water, sewer, gas, electric, cable, and <br /> telecom via the subdivision map. A fire hydrant shall be located at or near the <br /> end of the water line to allow the water line to be flushed if needed to maintain <br /> water quality. If a hydrant cannot be placed in this location, then the applicant <br /> shall work with the City's Engineering and Construction Division and Fire <br /> Department staff to identify and agree on an acceptable alternative. <br /> 31.Applicant shall install and implement bioswales and landscaping which are <br /> acceptable to the City Engineer to fulfill the requirements of the San Mateo <br /> County NPDES permit. <br /> 32. No improvement work shall be commenced until plans and specifications <br /> have been approved by the appropriate City official whose approval is <br /> required for the improvement work. Improvements shall be installed in <br /> accordance with the approved plans and specifications, to permanent line and <br /> grade, to the satisfaction of the City Engineer who shall have such work <br /> inspected. All work shall be subject to such inspections as the City Engineer <br /> deems necessary. All improvements shall comply with the current design <br /> standards and the standard specifications of the City in effect at the time of <br /> approval of the improvement plans unless exceptions have been granted. The <br /> burden of proof shall lie with the applicant to show, to the satisfaction of the <br /> City Engineer, that alternate designs, materials and specifications are equal <br /> to such standards or specifications. All grading and/or major vegetation <br /> ATTY/RES0.2263/APPROVING A PLANNED DEVELOPMENT PERMIT(FINGER AVE) <br /> REV:07-02-12 VR <br /> Page 13 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.