My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-07-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-07-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2012 9:27:35 AM
Creation date
7/5/2012 4:54:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
7/9/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.D. - Page 1 <br /> RE PO RT <br /> To the Honorable Mayor and City Council <br /> From the Cit Mana er <br /> July 9, 2012 <br /> SUBJECT <br /> Award of Contract - Redwood Creek Channel Wall Replacement Project (Redwood <br /> Avenue and Valota Road) <br /> RECOMMENDATION <br /> Approve, by motion, the contract documents and award the standard form contract for <br /> the Redwood Creek Channel Wall Replacement Project (Redwood Avenue and Valota <br /> Road) to Soil Engineering Construction Inc. of Redwood City for their responsive and <br /> responsible low base bid of $373,958.00 and authorize the City Manager to increase the <br /> contract amount, if necessary, up to 10% of the amount awarded. <br /> BACKGROUND <br /> Redwood Creek and its tributaries comprise about eight miles of waterway and traverse <br /> much of Redwood City. A comprehensive conditions and capacity analysis of the entire <br /> Redwood Creek and its tributaries has been conducted and the observations, data, <br /> findings, and recommendations are in draft. Staff is evaluating the information to <br /> formulate a systematic Redwood Creek improvement program to prioritize future <br /> improvements. <br /> The section at Redwood Avenue and Valota Road is a trapezoidal concrete channel <br /> section built in 1967 as part of the creek improvements funded by the General <br /> Improvement District 1-65. For the past decade, this section of wall has been gradually <br /> failing. Replacement of the section of wall is necessary to avoid possible wall failure. <br /> The proposed replacement of the Redwood Avenue and Valota Road section precedes <br /> the adoption of a comprehensive program, but is consistent with the findings of the <br /> analysis. <br /> ANALYSIS <br /> Biggs Cardosa Associates, Inc., was retained to prepare plans and specifications for <br /> this project. The project was advertised for public bidding on May 23, 2012 and bids <br /> were opened on June 13, 2012. <br /> Six (6) bids were received and are summarized in the table below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.