My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-07-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-07-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2012 9:27:35 AM
Creation date
7/5/2012 4:54:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
7/9/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 235 <br /> constitutes a major aesthe�ic impact taken in the cantext of existing conditians and <br /> character of the site and surrounaings. <br /> Respanses J-4Q through J-50 <br /> These responses relate to our comments regarding the DEIR's analysis of the <br /> Creekside Green alternative. <br /> Respanse J-42, {regarding Biologic impacts) acknowledges that the Creekside <br /> Green alternative will remove fewer trees. But then somehow implies that it will <br /> require similar Tree Protection, as if sornehow this matters in e�aluating whether <br /> Creekside Green reduces impacts. Dnesn't the simple fact that the Creekside Green <br /> Alternative will remove fewer trees show clearly that it is less impactful than the <br /> praject in this regard? <br /> Response J-44 (Hydrology and Drainage] The response correctly notes that the <br /> Creekside Green alternative decreases impervious surfaces near the creek and <br /> provides a clear means for incorparating LID stormwater design. Does this not show <br /> that this alternative reduces impacts over the proposed project in this regard? <br /> Response J-46 (Land Use Compatibility and Aesthetics) The FEIR response <br /> refers to the discussion in the DEIR on the aest�etic impacts of the project,which <br /> identifies garage views and massing of the interior homes as seen from Finger <br /> Avenue.The FE1R respanse simply ignores our comment that the views described <br /> CANNOT be seen from Finger Avenue because they are screened behinc�the new <br /> project home on Finger [7), existing residences, and vegetative screening as shown <br /> on the plan.Their argument is nat supported by the facts of the project design and <br /> implies an impact for which there is no supporting evidence. <br /> Respanse J-49 (Traffic/Parking) The response correctIy notes that the Creekside <br /> Green alternative adds public parking spaces to t�e street,whereas the praject <br /> eliminates 6 spaces.The EIR claims there is no significant impact to parki�g capacity <br /> as a result of this loss,because excess parking capacity currently exists on the street. <br /> This response and the EIR itself fai�s to acknowledge or evaivate resident concerns <br /> about parking impacts tn traffic and general maneuverability on Fi�ger Avenue <br /> (expressed numerous times in the recard and asked ta be studied) and the potential <br /> far increased future parking demand should properties an �1 Camino Real (�1/2 <br /> block from the site) be redeveloped under the new Mixed-Use Carridor zoning that <br /> will be designated there under the new General Plan. <br /> So, even though the FEIR preparers acknowledge that: <br /> 1) Creekside Green saves more trees than the project <br /> 2) Creekside Green contains less impervious surfacing within the 2S' creek <br /> setback zone <br /> 3] And Creekside Green preserves public parking capacity whereas the project <br /> reduces public parking capacity- <br />
The URL can be used to link to this page
Your browser does not support the video tag.