Laserfiche WebLink
8.A. - Page 371 <br /> home on Lot 7 is the subject of a simulation provided in the Draft EIR because it is <br /> one of two homes that will be readily visible from Finger Avenue. The significance <br /> of this visual change is discussed at length in the Draft EIR, and found to be less than <br /> significant. <br /> Comment/Response G-36 (No Project Alternative - e�sting structures and geology) <br /> • The Draft EIR's discussion highlights the older structures present on the site were <br /> not built to modern seismic codes (which is a fact), and therefore, compared to <br /> protection afforded by new construction, residents occupying these structures are at <br /> increased risk during an earthquake (a reasonable inference). The Draft EIR's No <br /> Project Alternative discussion is related to the effects of leaving the site in its current <br /> condition, and the Draft EIR does not make the leap (as suggested by the comment) <br /> to conclude this alternative is in fact infeasible by speculating about the economic <br /> (in)feasibility of retrofitting existing structures. Rather, if the project does not go <br /> forward as envisioned under the No Project Alternative, and the e�sting structures <br /> are retained indefinitely, seismic retrofits may or may not be undertaken by current <br /> or future owners depending upon their interest and ability to make the investment. <br /> Comments/Responses G-38 and G-39 (Four Lot R-1 Zoning Alternative) <br /> • Contrary to the comment's assertion, CEQA does not require the No Project <br /> Alternative to be designed in a way that avoids or lessens a project's environmental <br /> impacts. The No Project Alternative identifies what is anticipated to happen should <br /> the project not go forward, i.e. remain in its current developed state or redevelop <br /> according to R-1 zoning regulations under a straightforward subdivision process with <br /> four lots and potentially up to eight units (a primary and secondary unit on each lot). <br /> Comments/Responses G-40 and G-41 (Nine Lot Standard Setbacks and Roadway Alternative <br /> A) <br /> • As explained in detail in FEIR Response G-3, the project's environmental impacts <br /> requiring mitigation (cultural resources,hydrology, geology,biology, <br /> visual/aesthetics, and air quality) do not directly arise from the project's size or <br /> design,rather these impacts result from site conditions which would be affected to <br /> some degree by any development on the site, and therefore not susceptible to <br /> substantial reduction or avoidance by an alternative. Contrary to the comment's <br /> assertion,the EIR is not required to provide evidence of the economic feasibility or <br /> infeasibility of the alternatives it evaluates for the decision-makers consideration. If <br /> an alternative was being eliminated from further consideration in the EIR on the <br /> basis of economic infeasibility,the substantial evidence to support that conclusion <br /> would need to be included in the EIR, but the only two alternatives rejected from <br /> further consideration in the Draft EIR(Location Alternative and Five-Lot R-1 <br /> Zoning Alternative) are rej ected for other reasons, as explained in the Draft EIR. <br /> Comments/Responses G-43 and G-44 (Project with 25 Foot Creek Setback Alternative) <br /> • The Draft EIR is not saying that the houses could not be reduced in size under this <br /> alternative for it to be feasible,rather the discussion identifies how the square <br /> footage lost to an increased creek setback for Lots 1-4 could be re-gained(if desired) <br /> by increasing the second story floor area and/or reducing the front setbacks. The lot <br /> sizes are not"small", rather they are at least 6,000 sq.ft., and the houses on each lot <br /> are proportional to the lot size according to the zoning district's lot coverage <br /> standards. <br /> Finger Avenue Nine-Lot Planned Development Project 5 Responses to FEIR Comments <br /> City of Redwood City June 2012 <br />