Laserfiche WebLink
i nd i ngs to a I low a ppl ica nt's proposed stormwater <br /> eatment creek setback modification for �ots 1 -4 <br /> . MitiQation includes: Creek bank tree protection, restoration, reducing <br /> erosion during construction & stormwater drainage & treatment mitigation, <br /> etc. (See EIR Mitigations BIO-4, GEO-4, & HYD-5, 6 & 7). <br /> . Will maintain slope stability of creek bank <br /> . MitiQation includes: Drilled pier & grade beam foundation for Lots 1-4, <br /> creek erosion protection, recorded ��no-build" 15' easement for Lots 1-4, <br /> enhanced riparian landscaping , etc. (See EIR Mitigations GEO-3,4 & <br /> Conditions of Approval #17 -19 & 24). <br /> . Will be desiQned to avoid discharQe of pollutants directly to watercourse- <br /> . MitiQation includes: Designed to avoid discharge of pollutants into creek <br /> (See EIR Mitigations HYD- 5, 6 & 7 & Conditions of Approval #16, 17, 19, <br /> 24, 26, 31, 34-37, 41 and 46). <br />