My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-12-08
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-12-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 1:54:02 PM
Creation date
12/4/2003 3:54:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
12/8/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Transportation Impact Fee — A Brief Description <br />The transportation impact fee is assessed on new development for its <br />proportionate share of the costs of transportation improvements attributable to <br />increased tips generated by new deg ilopment between 2000 and 2020 on the <br />citywide trans portation system. The use funds improvements related to the <br />cumulative impact of traffic generated by new development, above those site - <br />specific frontage improvements required by ordinance and those mitigations <br />required as conditions of approval. <br />New development does not pay the portion of improvement costs related to <br />deficiencies existing as of 1999. The cost portions related to those deficiencies <br />are funded by state gas tax, countywide funds approved by voters and <br />administered through the San Mateo County Transportation Authority, other state <br />and federal grants, assessment districts, and redevelopment or general funds. <br />The improvements upon which the fee is based are: <br />• Intersection improvements, such as the addition of turn lanes, traffic <br />signals, median closures, and crosswalk warning light systems. <br />• Corridor and area -wide improvements, such as extending Blomquist <br />Street with a bridge over Redwood Creek, widening Veterans Blvd. <br />between Chestnut Street and Woodside Road, and neighborhood traffic <br />calming projects. <br />• Alternative mode /transit improvements, such as shuttle systems, sidewalk <br />improvements, bus shelters, pedestrian and bicycle amenities, and TDM <br />measures. <br />The transportation impact fee pays for 100% of the total project costs of <br />alternative mode /transit improvements on the Traffic Impact Mitigation Fee <br />Projects list. However, the fee pays only a portion of the intersection <br />improvements and the corridor and area -wide improvements, which are also <br />funded by outside sources, by new development that impacts those <br />transportation facilities to be improved, and by existing development (i.e. the <br />City's General Fund). <br />Traffic generated by new development impacts not only transportation facilities <br />close to specific sites, but also cumulatively impacts the entire City's <br />transportation network. For this reason, the transportation impact fee collected <br />from any specific development is used for citywide transportation improvements, <br />not merely improvements that are within close proximity to the development site. <br />The traffic fee is assessed on all types of new development, including expansion <br />of existing buildings, that will increase demand on traffic facilities through PM <br />peak hour trip generation, the amount of vehicle trips generated by a <br />development during the highest one -hour period occurring between 4 PM and 6 <br />PM. <br />
The URL can be used to link to this page
Your browser does not support the video tag.