My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 Walter Rask
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Under 60K
>
Agmt12 Walter Rask
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2013 10:40:00 AM
Creation date
7/16/2012 3:46:41 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Walter Rask
PROJECT NAME
Conceptual Design phase Block 2/Depot Circle
RMP File Number
304.5, 100, 402
Date
7/4/2012
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A" <br /> SCOPE OF SERVICES <br /> Conceptual Design Phase—Within 30 days of Agreement <br /> 1. As directed by Staff, meet with the design architecture firm for the Block 2/Depot <br /> Circle Project to: <br /> a. Establish design guidelines for the proposed project <br /> b. Review conceptual drawings <br /> 2. Provide written comments on conceptual drawings <br /> 3. Review resubmittals, if any <br /> 4. Provide written recommendation to City Staff regarding Conceptual Design <br /> conformance to the Downtown Precise Plan <br /> Schematic Design Phase—Within 6 months of Agreement <br /> 1. Based on accepted Conceptual Design review Schematic Design submittals for <br /> conformance with the Downtown Precise Plan and approved Conceptual Design <br /> 2. Provide written comments to City Staff with recommendations for design change <br /> or other comments as appropriate. <br /> 3. Recommend to City Staff acceptability of the Schematic Design Package for <br /> inclusion with a Disposition and Development Agreement <br /> Depot Circle Urban Design —Within 6 months of Agreement <br /> 1. Review the Downtown Precise Plan to understand the context for development of <br /> Block 2, the Winslow Lot property, and their relationship to the built downtown. <br /> 2. Prepare sketches and design ideas for increasing the size of the Winslow Parcel <br /> for development of residential or other uses as identified by City Staff. <br /> 3. Review and provide written comment on the urban design implications of the <br /> proposed Block 2 development, including such elements as the e�ctension of <br /> Theatre Way through the new development site and the surrounding public <br /> spaces. <br /> 4. Review and provide written comment or sketches of the relationship of a <br /> development on the Winslow �ot to the proposed Block 2 development (issues <br /> such as building orientation and intervening public spaces, for example), and the <br /> Sequoia Station Rail Station. <br /> All work shall be as directed by staff. Consultant shall bill monthly on an hourly basis, at <br /> $150 per hour. <br /> ATTY/AGR/2012.083lWALTER RASK AGR 9 <br /> REV:07-03-12 VR <br />
The URL can be used to link to this page
Your browser does not support the video tag.