Laserfiche WebLink
FloGard Perk Filter <br /> Inspection and Maintenance Checklist <br /> Property Address: 201 Marshall Street. Redwood City. CA Property Owner: Raintree Partners/Contact: <br /> FloGard Perk Filter#: Date of Inspection: Type of Inspection: ❑ Level 1 ❑ Level 3 <br /> ❑ Level 2 ❑ Other ' <br /> inspector(s): <br /> Defect Conditions When Maintenance Is Maintenance Comments(Describe maintenance Results Expected When - <br /> Needed Needed?(Y/N) completed and if needed maintenance was Maintenance Is PerFormed <br /> not conducted,note when it will be done) <br /> 1. Sediment,Trash Sediment,trash and debris Sediment,trash and debris removed <br /> and Debris accumulated in the flow-through from flow-through planter and <br /> Accumulation planter. Planter does not drain as disposed of properly. Planter drains <br /> specified. within 3-4 hours. <br /> 2. Clogs Soil too deep or too shallow.Sediment, Planter drains per design <br /> trash and debris accumulated in the specifications. <br /> flow through planter. Planter does not <br /> drain within five days after rainfall. <br /> 3. Downspouts and Flow to planter is impeded. Downspouts and sheet flow is <br /> Sheet Flow Downspouts are clogged or pipes are conveyed efficiently to the planter. <br /> damaged. Splash blocks and rocks in <br /> need of repair, replacement or <br /> replenishment. <br /> 4. Overflow Pipe Does not safely convey excess flows to Overflow pipe conveys excess flow <br /> storm drain. Piping damaged or to storm drain efficientJy. <br /> disconnected. <br /> 5. Structural Planter is cracked, leaking or falling Cracks and leaks are repaired and <br /> Soundness apart. planter is structurally sound. <br /> 6. Filter Cartridges Any visible damage to cartridge; Meet the design specifications; <br /> blockage due to debris or maintain design treatment flow rate: <br /> sedimentation. 1.5 gpm/sf of filter surface area. <br /> 7. Miscellaneous Any condition not covered above that Meet the design specifications. <br /> needs attention in order for the flow- <br /> through planter to function as <br /> designed. <br /> Flow-Through Planter Maintenance Plan- Page 3 <br />