My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 Encon
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Under 60K
>
Agmt12 Encon
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2012 5:05:55 PM
Creation date
7/23/2012 3:44:41 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Encon
PROJECT NAME
Design Professional Agreement Fair Oaks Community Center and Senior Center AC RTU Equipment Replacement
RMP File Number
304.5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT"A" <br /> SCOPE OF SERVICES. TIME AND FEE SCHEDULES <br /> Fair Oaks Community Center and Senior Center A C RTU Equipment Replacement <br /> PROJECT DESCRIPTION: <br /> Mechanical and electrical consulting engineering services for the replacement of the existing <br /> two AC rooftop units. <br /> SCOPE OF SERVICES: <br /> A. DESIGN PHASE <br /> Task��.—Site Visit <br /> Consultant shall review existing site conditions to include at least one (1) site visit <br /> with city's representative, coordinate with Trane, and compile design information. <br /> One (1) site visit with city's representative. <br /> oi <br /> Task�—Construction Documents— HVAC <br /> Consultant shall provide mechanical, with electrical circuiting and connections, AC <br /> rooftop unit replacement project permit and bid documents. <br /> Consultant shall: <br /> • Evaluate AC loads, select equipment and provide Title 24 forms. <br /> • Provide demolition drawings, new drawings, details and equipment list <br /> schedule. <br /> • Coordinate design with structural engineers and electrical requirements. <br /> • Reconnect gas and condensate drain to new AC Rooftop Units. <br /> • Re-connect/re-circuit new AC Rooftop Units as required. <br /> • Provide electrical circuiting for new HVAC equipment and controls. <br /> oz. <br /> Task�— Plan Check Comments <br /> Consultant shall provide revisions as required for the permitting process. <br /> Task 4—Client Meetinqs <br /> Consultant shall attend one (1) coordination meeting. <br /> B. CONS TRUCTION PHASE <br /> Task`�—Construction Administration <br /> Consultant shall review submittals and shop drawings for compliance to design and <br /> accuracy, respond to RFI's, and phone inquiries. <br /> 08 <br /> Task'S—Post Desiqn Services <br /> Consultant shall provide bid assistance, produce punch list(s), and perform site visits <br /> and attend meetings during construction. <br /> ATTY/AGR/2012.056/DESIGN PROFESSIONAL AGREEMENT ECON <br /> REV:05-09-12 VR <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.