My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-09-10
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2012 5:16:54 PM
Creation date
9/6/2012 4:57:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.D. - Page 9 <br /> 3. Inspect Pedestrian Push-Buttons for Signal Controller actuation and bent,broken, or <br /> corroded hardware. <br /> 4. Inspect Signal Poles for paint, dents, or cracks and missing hand hole covers. <br /> 5. Inspect pull boxes for cracked,broken, or missing lids. Check condition of splices. <br /> 6. Inspect Loops in Roadway for exposed, torn, or broken wires. <br /> c. Record Date and Time along with findings and work performed. <br /> Semi-Annual PM <br /> On a semi-annual (every 6 months) basis, Contractor will perform the Monthly PM as well as the <br /> Semi-Annual PM and complete repairs as necessary. Listed below is the Semi-Annual PM inspection <br /> list. <br /> 1. Rotate Back-Up Batteries. <br /> 2. Take voltage measurements from Back-Up Batteries by performing Battery Load-Test. <br /> 3. Test Battery Back-Up by disconnecting PG&E power at service cabinet. <br /> 4. Check ground rod clamp and wire. <br /> 5. Visually check integrity of wire splices. <br /> 6. Adjust all mast arm mounted street name signs as needed. <br /> 7. Record Date and Time along with findings and work performed. <br /> Annual PM <br /> On an annual (every 12 months) basis, Contractor will perform the Monthly PM, Semi-Annual PM, <br /> Annual PM, and complete repairs as necessary. Listed below is the Annual PM Inspection list. <br /> L Inspect Utility Electrical Service Cabinet and hardware supplying power to Signal <br /> Controller Cabinet. <br /> 2. Vacuum and clean Signal Controller Cabinet, Electrical Service Cabinet, and BBS <br /> Cabinet(if applicable). <br /> 3. Take voltage measurements at service inputs to Signal Controller Cabinet from Utility <br /> Service Feed. <br /> 4. Take voltage measurements at BBS inputs from Utility Service Feed(if applicable). <br /> 5. Take voltage measurements at service inputs to Signal Controller Cabinet from BBS (if <br /> applicable). <br /> 6. Check for water accumulation and duct sealant as necessary. <br /> 7. Replace Signal Cabinet Filter if nylon-mesh type. <br /> 8. Vacuum and clean Signal Cabinet Filter if aluminum-mesh type. <br /> 9. Inspect hinges and locking mechanisms on all Signal Associated Cabinets and lubricate <br /> as necessary. <br /> 10. Record Date and Time along with findings and work performed. <br /> 3- Other Maintenance <br /> a. In addition to PM inspections and repair, Contractor will respond to other maintenance service <br /> requests such as but not limited to traffic signal outages, traffic signal malfunctions, and <br /> requests to replace burnt out signal lamps. <br /> b.Contractor will make every effort to incorporate other maintenance service requests into PM <br /> inspection and repair. <br /> c. Other Maintenance is considered Extra Work and will be billed at the negotiated Time and <br /> Materials Rate. <br /> 4- Emergency Work <br /> a. Any service requests <br /> General Services Agreement between the City of Redwood City and REV:08-15-12 JS <br /> Cal-West Lighting and Signal Maintenance, Inc. <br /> ATTY/AGR/2012.104/CAL-WEST LIGHT&SIGNAL MAINTENANCE INC Page 6 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.