My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-09-10
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2012 5:16:54 PM
Creation date
9/6/2012 4:57:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 316 <br /> Ms.Maureen Riordan <br /> 5enior Planner <br /> Planni�ng Department <br /> City of Redwovd City <br /> 1fl17 Mid�efield Road <br /> Re�wood Ci#y,CA <br /> June 19,2D12 <br /> Subject; Finger Avenue P�-�de �arnrnittee Camments an the FEIR <br /> Dear Ms.Riardan, <br /> We have reviewed the Final E[R and�rovide the fo]lowing vvith respect to the City's <br /> adec{uacy of its z-esponses tn the DEIR comrnents we submitCed i�September of last <br /> year. <br /> Res�onse]-2 <br /> This response v�ras to our questic�ns abauf the survey da#a and canstruction of the <br /> Vesting TenCative map.We realize that the VTM was constrEac�ed by a licensed <br /> surveyoc,and apprec�ate that you haee v�rified that lat de�t�s for the Ea�an Ave. <br /> parcels have been held. However our request for clarificatian of the location c�f the <br /> creek bank ar�d ehannel wit�in the defined lot]imits is not addressed,nor has a rnap <br /> been pravided that e�ends topographic informaCion at least 1QQ'from the property <br /> boundaries as is required by RWC Code Section 30.3SH�.The shape and position of <br /> the creek c�annel and bank is critical to determining actual availabte buiiding site <br /> area for the projec� N1cCloud's[�riginal VTM subtnitted in 2QQ6, erron�ously placed <br /> the top af�iank within the stream channel appraxinnately 7-8 ft BE�OW tne <br /> topograp�ac banl�top.This was an egregioUS errar ctear2y motivated by an atternpt <br /> to show more net lot area on the prnject site than actually exists,A complete survey <br /> af the creek within and adjacent to the project baundaries is essential for clarifying <br /> the ambiguities we pointed out in our previaus c�mment.In t�is respect,��e <br /> response da�s not address aur concerns, <br /> Res�n�s��-1�. <br /> While the response indicates�hat th�project roadway will naw incarparate <br /> perv€aus surfacing,which will reduce suz�face runoff and th�amc�unt of stormwater <br /> that wiI]need to be treated,the response does not addr�ss whether there is <br /> sufficient landscape area to treat the runnff as required by new low-irnpacE design <br /> stand�rds,The drainage plan,which is difficult to read as presented, app�ars to <br /> show swales within privat�yards.The FEIR does nat verify that there is sufficient <br /> l�ngth and capacity of th�se swales ta treat runoff to standard.Plus,given the <br /> Ioca#ion vf swales wi�hin individually owned properties [not H{�A cont�ralled or <br /> rnaintained},how daes the City�ropose t�guarantee that Che swales wauld be <br />
The URL can be used to link to this page
Your browser does not support the video tag.