My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-09-10
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2012 5:16:54 PM
Creation date
9/6/2012 4:57:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 319 <br /> apinion,would t��cancealed within an administrative draft report that apparently is <br /> nnt availah�e fflr puhli�review. <br /> Disc�assing issues of poten�iai risk tin t�e properties frorn sirearn bank erosion and <br /> slumping�s frustrated by this insistence that this is a case of disagreeing��erts, <br /> when in fact�he City and developer have been playing cat and rr�ouse regarding this <br /> issue for years.The developer and his c�nsultant insisted thera is na evidence far <br /> bank erosion d�spite the clear observation of the 50a cott�age foundatians being <br /> undermined and th�e e�ensive occurrence ofrip-rap and vario�as erasion contra] <br /> structures installed all along the creek ctzannel.F'ar the DE[R,�he City ao`y admits <br /> that erosian is adjacent to Lot 3,where the 5Qa cattage now stands (�n fact,this <br /> ongaing erasion is cited in fihe EIR as a reason that some nf the alternatives that <br /> retain this strucCure are infeasible ar undesireable),but daes not seern ta cQnsider, <br /> in sug�esterl rnit�gatians that only affect Lot 3,tk�at the probletn is likely extant along <br /> the entire stream bank-especially where retaining walls(sozne fafling] and other <br /> erosion control structe�res have been utilized in what�s clearty a�iutile attempt ta <br /> thwart Mother Nat�re.As regar�s evidence�ac slumping oFthe�bank,the City <br /> argUed in the DEIR that such a�n oc�urrence is unIikely insofar that bvwed trees, <br /> which are evidence far lateral sail movement,were nat abserved,When we <br /> identified bowed trees in our DEIR comments,the�respons�now is that this <br /> evidence is not indicative of the t,ype ofslum�features that we suggested rnay be <br /> present in tJ�e creek area.In fact,they�n�y claim the featr�a�e of con�ern does not <br /> exist (see above).Lat's be cleat�.There is clear,substantial evidence for bank <br /> erQSion.7"here is undisputed evidence of a sa�l mass adjacent to lots 3 and 4 that has <br /> producea a narrowing of�he creek channel,�nd has,as evidencec��y the VTM <br /> contours,morpholo�,y consistent with a soi�slump.There is clear evidenee fram <br /> trenching investigations that rriost material comprising this feature is of natural <br /> origin and not rr�an-made�11.There is clear evidence of lateral soi!movement <br /> evidenced hy bowed trees [a Mz0 degree bow is nat minor bowing as shown in <br /> photographs presented in ouz-D�IR comments) and rracked anti deformed retaining <br /> wa�Is. None of this evidence matters to the reviewers,The old adage that ff it"looks <br /> like�duck,walks like a duck,an�l c�uacks like a duck,�hen in must be a duc[c" <br /> apparemly does not influence expert opinion in this case. <br /> If such a slump exists,th�ass�m�tians of uniform soil strength that is likely us�d to <br /> design appropriate setbacks are na#`ralid.We have asked repeatec�Iy for <br /> documentation to support tl�e suggest�d setbac�CS and founda�#on design,and no <br /> data has been presented.The EIR timits erosion mi�igativn to Iat 3 near the existing <br /> 50a eattage,which is,beGause of the�astence af the sfiructure,the only p]ace that <br /> we can measure the impact of erosion, tt clvesn't mean it isn't happening elsewhere <br /> on the prvject site.7'he mitigatian limit�d to Lot 3 is insufficient because the <br /> a�railable data sug�ests the entire creek bank SW ofthe slunnp area shauld be <br /> equally prateeted.Furthermvre,the EIR has not dernonstrated hnw effective the <br /> praposed erasian znitigation ptanting plan will bs; ir�fact it does not describe that <br /> planting at all. <br />
The URL can be used to link to this page
Your browser does not support the video tag.