My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-09-10
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2012 5:16:54 PM
Creation date
9/6/2012 4:57:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 321 <br /> evaluate the aesthetics of the internal (publiciy accessed) partion of the project as a <br /> means of de�ermining if the new nezgh�orhood aesthetac carraplements ar degrades <br /> the pveraJl visua!character nf the neighbarhood. <br /> One can see from Figures 3 (viewed from Finger Avenue) and 7-14,the narraw <br /> roadway and setbacks of the lot 7 and 6 t�omes situates the bui7dings tess than 5a ft <br /> apart across the roadvvay,as opposed ta approxfrnately 90 ft ar rrtor�for homes <br /> across Finger,This canfiguration,conpled with the two-stary massing of all of the <br /> project hornes,presents a"canyon-]ike"feel within the project itself--m�ch <br /> different than alnng FingerAvenue ar anywhere else in the nearby neighborhood, <br /> The FEIR also ciaims that the Iot 7 and]nC 8 hames do not create an aesthetic impact <br /> because ti�ey eonforr�x to R-Z District standards and relate apprnpriate2y to S4,4Q, <br /> and 3b Finger Ave. First off,homes on lots 7 and$do not cor�fnr�n to R-1 standards <br /> as side and rear yard exceptions are ret�uested far these lots under the PD perrnit <br /> application.Secnnaly,this analysis is subjective and ignares any objective facts,The <br /> r�part fails Co note that the side facades of lots 7 and$are quite lang (�60�t} and <br /> visibie,in additian to�44'wide front Facades an Pinger,and both have twa-story <br /> massing.Front facades ot 40,54,and 3b Finger are I�axedy mure than half as long as <br /> that of the proposed homes and side facades of 40 and 54 Finger(viewable in part <br /> from the 50 Finger driveway) are significant�y sharter than the new homes,40 <br /> Finger also has singte-story massing and all�hree exist�ng street front h€�mes have <br /> cansiderably lower lot coverages than proposed for Lots 7 and 8;40 and 54 Finger <br /> are set�ack 8-�.0'farther from the street as wel1. <br /> Also in response to 1-Z6,the Ciky takes issue writh the retevance of the summary <br /> statistics prc�vided,The response fails to acknovvledge that we atso provided,in <br /> Attachment C,the corr�plete information for individual properties,so varia�ions in <br /> building mass and scale can be evaluated in t�at conrext as well,We also provided <br /> plats showing haw individual houses eannpare to those in the proposed�roject.The <br /> data clearly shaw that th�McGawan Develapment,when cansidered in the cantext <br /> of the existing con�itions represents a devela�rnent form that is sa antithetic to the <br /> bulk of the neighborhood that its presence will anly serve tn degrade the current <br /> character nf the neighborhaod. <br /> Finally,the J-25 response questions the accuracy af statistics provid�d by pointing <br /> aut that project lot sizes are listed incorrectly.The F�IR preparers obviously did nvt <br /> read the faotnvte in Attachment C where these statistics are preser�ted,explazning <br /> that lot sizes within PDs and for creek si�e lots were adjusted to allow for <br /> apprapriate cornparison of creek-side and PD Iors to non�creetcside and <br /> canven#ional lots,As expIained in the foatnote,lot areas were adjusted to remave <br /> the portions of creelrside lots that are cantained within the Creek,as this is nut <br /> buildfng site area{for non-creel�.sid�1ots,building si�e area and gross lot area are <br /> eyuivalent).In addition,PD's have some camman open-space areas that should be <br /> accauz�ted far to establish eyuivalence in cornparing lot caverage and lot siz�with <br /> non-P�lots that don't enjoy tnis amenity.The MeGowan deve�opment proposal has <br />
The URL can be used to link to this page
Your browser does not support the video tag.