Laserfiche WebLink
8.A. - Page 362 <br /> Finger Ave.Pmject�iR Comments <br /> )une 15, 2U12 <br /> Page 3 of 12 <br /> impaCks of some undisclosed alternative derived frpz�t an undisclosed broader project <br /> objertives w'ith thase of the proposed praject and alter�tatives incIuded in the ETR. <br /> Despite zero description of either the broader abjectivea or t�t� reataltant alternative, the <br /> EIR cancludes, absent any supporting information, that t�te resultant aIternative(s) <br /> would not redUCe any of the project's impacts. Fox example, under Impart GEO-4, the <br /> respanse states' "Broader objechives would not have influenced the development of <br /> aaternatives ta addr�as this ,gea�agy impact as the need for er�sican pmtection aris�s <br /> under any circumstance ineiuding exisHng condition." T'his respvnse is incorrect on its <br /> face, failing, for example, #o cansider tha#a project with ho�ses set back 54 feet ar more <br /> frorn the creek wottld, uiilike the projec# or existing conditions, avoid the erosion and <br /> therefore the need far erosion protection. <br /> This "analysi�" is thick with these sart of false and unsupported statements <br /> masquerading as CEQA analysesi. For example, the discussion of Impact BIO-3, relati�g <br /> ko the impacts #o the trees on the project site states, "As discUSSed in the DEIR, npne of <br /> the #rees tp be removed....provides a aubstanfial visual contribution to tI1e site or its <br /> surroundings and loss of these trees is more #han o#fset by th� projec#'s tandscape <br /> p�anting plan.,,.". This response Eai1s to �recognize that neigi�boxs have submitted aver <br /> 75 separate statements attest�ng to the va2�e o#the trees and exis#in.g lvw develapment <br /> intensity of the site in fhe context af the averal� visval changes ta the proJect, which <br /> constitutes eviderice of the significance pf t�te resource asid the patent�al signi#icanc,e of <br /> the chaanges to kha#resource. The EIkt's contenfion that small trees planted as perirneter <br /> landseaping are visuatly similar to nume=ous�4Q-B(J-fopt tall mature trees flies in the face <br /> of coc�mon sense. Five-and ten-gallon landscape trees axe�visual�y qufte diff�rent fro�n <br /> the large, maivre oaks and redwoods on the site. The EIK seema ta recognize this <br /> weakness in steadfastlp refusing ro provide obJective phatagimulations of the project, <br /> which results in the EIR`s condusions being unsupported by substantial evidence, As <br /> described below, ather examples of sirnilar unsupported and arbitrary conclUSiona can <br /> be found throvghout the document. <br /> Project DescripHan Deficiencies <br /> We previausly comrnented tl�at a complete, futite, stable pr�ject des�riptian is a <br /> prerequisite for an accurace impact assessment and that tlze DEIR Praject Description <br /> arnitted a nurr�ber of elements critical to ��euratety and adequately assessing the <br /> project's impacts,as fnllaws: <br /> 1. A detai�ed starmwater treatment plan,whieh is essential to c�etermining whether <br /> the project's impacts to stqrmwater quality and dowristream cumulative flood <br /> �azards, as �cvell as whether the project Can be constnected in evmpliance with <br /> Kegional Water Qualily Control Baard C.3 skandarda. Note that the RWQCB's <br /> regional Stvrmvvater Permits states #hat these plans should be avaiiable for <br /> review in CEQA documents (Section C.3 (4.). It is unclear that the projec� can <br /> actually meet the RWQCB's Law Irnpact Development(LID) standards giv�n#he <br /> density of development prpposed far the site. <br /> 2. Blevatians and desrrip�ipn of exterior treatrnent of each of the proposed hauses, <br /> which are easential to determining the proje�Ys visua2 impa�ts and tomplian�e <br /> wikh general i'fan goals and policies, <br />