My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-09-10
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2012 5:16:54 PM
Creation date
9/6/2012 4:57:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 365 <br /> Finger Ave,Froject FEIR Camments <br /> June 15, 2012 <br /> Page 6 of�2 <br /> Response G-31 <br /> This comment asked how large treea propoaed for preservation woezld survive given <br /> their raota'proximi#y to either the project hnttses and pa�rement raadways, and that the <br /> canopies of several of th� irees fs in the same air space that the second staries of several <br /> of fihe proposed houses. The respanse states that a new arborist report supperts the <br /> �ndings o# the previous arbarisYs reporrt. That is true. However neither arbo�ist's <br /> report adc�ressed the issues raisec2 in t�e comrnents, In fact, t}�e second report does not <br /> address project impacts at aII. Therefore this response fails #a addreas the substanc1e of <br /> the comrnent. <br /> Further, the City #ai�s tv provide any substantial evidenre #�at there vvputd be �a <br /> significant impacts to tha mature trees on the site or that such impacts would be <br /> apprvpriately mitigaked. On the other hand, the CiY+y has been in possession of <br /> substan�ial evidence indicating that a ntxmber of trees on the site would Iikely suffer <br /> significant impa�ts from construction and other proje�t-related acti�r�ities and has <br /> apparent�y chosen not to cansider thys informatian in �e EIR, T'he first of these is <br /> included on pages 30-32 of a City Sta#f Report to the T'lanning Camrnission, dated �eb. <br /> 1�,2009, In thia repoxt,staf�identi�iea 8 trees that they felt were IfkeYy not to survive de�e <br /> to fihe ama�nt of development in the tree prokecti�n zones and the arnpunt of impact on <br /> the root environmer�t. 'Thie report also npted tha�the Tree Arotection Zpnes identified in <br /> the McClenahan tree survey are tao small, and noted the tree protection provisians of <br /> this repork are general and da nat specifically address the individ�aI trees. In addition, <br /> sta#f nated that additianal impacks would possibly rest�It fmm canopy remova�.The s#aff <br /> report recommended oversight of tree proteetion by the City, installaiaon vf pier and <br /> grade-beam fonndations to rrainimize rAOt irnpaCt, a�d possibl�e madification af home <br /> designs. <br /> The secona piece of evidence for sig�ificant impa�t ta the trees to he retained is <br /> mntained in an etnail fram Nelda Matheny,President of Hortscier�ce, Inc.,a leading tree <br /> preservahon f�rm, to resident Daniel Ponti, dated Deoember 31, 2008 and submitted to <br /> the City c�n Jaan. 13,2011. Ms. Matheny noted ape�ific likely impacts fo tze�s #9 and #10, <br /> confir,med the staff repvrta cancluaion that the McClenahan TPZ's are like2y too Iow and <br /> lacking in any consideration of the impacts af caanopy removal. Ms. Matheny concludes, <br /> "I waudd question rvhether on[y 23 t�ees wilT in fact be removed, Because of the extensive <br /> intrusron info the arborisf's tree prvtectivn zane(verticatl�and horizo�tally), it is Iikel�thaE not <br /> ald the ttees fderttified for p�eservatio�t wtll in fact be�reserned. " <br /> Response G-32 <br /> This comrnent reyUesfed phofosiznulations af the proposed housea ta provicle object�ive <br /> evidence upan which to support the analysis of visua] impacts, The response stated that <br /> a coxnplete set of all project elevations is an fzle with the City, This essential information <br /> is not in the EIR. In additic�ry even i# the public knew �iat such elevatio�a existed <br /> (which was not discIosed in the DEIR) and ev�tt if they made the tima ta go to City Hal1 <br /> to laok at them, the public may or may not lae able tv interpre# #he elevations in #he <br /> context oE the site and neighborhood, Everyone can interpret photosimuIations, wHich <br />
The URL can be used to link to this page
Your browser does not support the video tag.