My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-09-10
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2012 5:16:54 PM
Creation date
9/6/2012 4:57:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 457 <br /> which would be built on a pier and grade beam foundation,and so such a setback would not <br /> avoid erosion nor eliminate the need to protect the yard from erosion, <br /> The comment suggests that the project's tree remova] impacts are significant and therefare <br /> presumably should have been addressed in an alternative design. The four living ordinance- <br /> size trees to be removed are not"large, mature oaks and redwoods" as stated in the comment, <br /> rather as depicted in FEIR Response G-3,they are ordinary common specimens(bay laurel, <br /> olive, pecar�,walnut)that do not substantially contribu#e visually to the site nar pravide <br /> substantial biologic value. The project retains those trees that are visually and biologically <br /> significant. <br /> COMMENT: Project Description Defciencies <br /> RESPONSE: The commentor identifies five specific items related to the project description <br /> where mare detait or clarification is sought. These comments restate infottnation requested <br /> by the commentor in Draft EIR comments G-9 through G-17, for which detailed responses <br /> have been previously provided (see FEIR pgs. 39-44}, <br /> COMMENT: Technical Analysis Deficiencies related ta Comments/Responses G-21, G-22, G-27, <br /> G-29, G-3Q, G-32, G-33, G-34,G-36,G-38, G-39, G-40, G�41,G-43, G-44, G-45, G-46, G-47, and <br /> G-50. <br /> RESP�NSE: The commentor takes issue with the FEIR's responses for a number of the <br /> D�TR comments, listed above. The FEYR responses adequately address the substantive issues <br /> raised in each of the identified comments.Nonetheless,where useful, additional detail and <br /> clarification for the identified responses are provided be2ow. <br /> Comments/Respanses G-21 and G-22 (stormwater runoff and treatment) <br /> • The project proposes 22,433 sq.ft. of impervious surface area, a net increase of 2,211 <br /> sq.ft. over existing conditions. The project's civi) engineer has performed <br /> calculations ta determine the design ofthe storm water runoffdetention and <br /> treatment system, sized par C.3 reqt�irements, The final design, per MM HYD-5 and <br /> MM FIYD-6, will be reviewed by the City's engineers at the improvement plan stage <br /> prior to issuance of a grading permit,to confirm the project complies with the latast <br /> RWCQB requirements at the time of permit issuance. The commentor ofFers no <br /> explanatian for tne suggestion that a project c�evelvped at just over 5 dwellir�g units <br /> per acre on minimum 6,000 sq.ft. lots cannot feasibly implement storrnwater <br /> requirements that are routinely implemented by more in#ense c�evelopments projects <br /> throughout the Bay Area on Iots srnaller than what the project proposes. The <br /> conceptual Grading and Drainage Plan and Utitity Plan included in the FEIR convey <br /> the project's proposed approach tv managing and trea#ing site runoff, and the City <br /> will confirm the actual construction details at the grading permit stage. <br /> Carr►ments/Responses G-27 (community character) <br /> • The comment identifies Response G-2b (which invol�es Lot 3 erasion protection), <br /> but the comment appears to relate instead to Response G-27 involving community <br /> character. The neighbors' opinions and concerns regarding the project's <br /> neighborhood compatibi�ity were widely known to the City when the Draft E[R was <br /> prepared, however,the Draft EIR was prepared by City staf�'and cansultants under <br /> Finger Avenue Nine-Lot Planned Development Project 3 Responses to FEIR Comments <br /> City of Aedwood City June 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.