My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res12 15217
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2012
>
Res12 15217
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2012 11:09:45 AM
Creation date
9/17/2012 11:08:08 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/10/2012 <br /> MITIGATION MONITORING OR REPORTING PROGRAM <br /> FINGER AVENUE NINE-LOT PLANNED DEVELOPMENT PROJECT <br /> Responsibility <br /> Impact Mitigation Timeframe for for Oversight of <br /> Implementation Implementation Implementation <br /> HYDROLOGY AND WATER QUALITY <br /> The project would Mitigation Measure HYD-5: The project developer shall Prior to submittal Project applicant Director of <br /> increase the amount implement a stormwater drainage plan during construction and of a grading and contractors Planning and City <br /> of impervious post-construction, approved by the City in conformance with permit to the City during all phases Engineer <br /> surfaces on the applicable state and federal requirements. Prior to submittal of a Engineer for of construction, <br /> project site,thereby grading permit to the City Engineer for review and approval, or review and and post- Regional Water <br /> increasing the amount such other site improvement permit that is a requisite prior to the approval, or such construction Quality Control <br /> of urban runoff. start of project site grading, the applicant shall prepare a other site measures shall be Board <br /> Stormwater Pollution Prevention Plan(SWPPP)that is consistent improvement the responsibility <br /> with applicable requirements and regulations. The SWPPP shall permit that is a of the <br /> be approved by the City Engineer concurrent with the approval of requisite prior to Homeowners <br /> a grading permit,or such other site improvement permit that is a the start of project Association <br /> requisite prior to the start of project site grading. site grading <br /> Less Than Significant Impact with Mitigation <br /> The project would Mitigation Measure HYD-6: The project shall install a Prior to Project applicant City Engineer <br /> create or contribute stormwater treatment system so that runoff would be filtered over recordation of the shall enter into <br /> runoff water which a minimum of twenty-five (25)feet of vegetation or through other final map an Operation <br /> has the potential to equivalent means and will not degrade water quality before and <br /> provide substantial discharging into the City storm drain system and eventually Maintenance <br /> additional sources of Cordilleras Creek. Prior to recordation of the final map,the Agreement with <br /> polluted runoff ar that applicant shall enter into an Operation and Maintenance the City. Long- <br /> could substantially Agreement, and provide a maintenance plan, with the City to term,the post- <br /> alter the existing ensure the ongoing operation and maintenance of treatment construction <br /> drainage pattern of controls for the on-site drainage system. Maintenance <br /> the site in a manner Agreement shall <br /> that could result in Less Than Significant with Mitigation be the <br /> substantial erosion or responsibility of <br /> siltation on or off site. the HOA <br /> Finger Avenue Nine-Lot Planned Development Project June 2012 <br /> Mitigation Monitoring or Reporting Program Page 5 <br /> RESO.#15217 <br /> MUFF#613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.