My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res12 15217
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2012
>
Res12 15217
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2012 11:09:45 AM
Creation date
9/17/2012 11:08:08 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/10/2012 <br /> MITIGATION MONITORING OR REPORTING PROGRAM <br /> FINGER AVENUE NINE-LOT PLANNED DEVELOPMENT PROJECT <br /> Responsibility <br /> Impact Mitigation Timeframe for for Oversight of <br /> Implementation Implementation Implementation <br /> BIOLOGICAL RESOURCES <br /> Protected birds and Mitigation Measure BIO-2.1: Preconstruction nesting bird Within two weeks The project Director of <br /> bats, and their nests, surveys shall be conducted by a qualified wildlife biologist within of demoiition and developer, prime Planning <br /> may be present in two weeks of demolition/construction activities scheduled to take construction construction <br /> landscaping or place between February 1 and July 31 (breeding season). All trees activities contractor and <br /> structures on site, and within the project area shall be surveyed. If active raptor or scheduled to take any <br /> could be impacted by passerine nests are detected during the pre-construction surveys, a place between subcontractor(s) <br /> tree removal or no-disturbance buffer zone shall be designated and maintained February 1 and <br /> building demolition around the nest until a qualified biologist has determined that the July 31 <br /> during young have fledged from the nest. The size of the no-disturbance <br /> implementation of the zone shall be determined in consultation with the CDFG. <br /> proposed project. <br /> Mitigation Measure BIO-2.2: A minimum of one Within two weeks The project Director of <br /> preconstruction bat survey shall be conducted by a qualified bat of demolition and developer, prime planning <br /> biologist(a biologist holding a CDFG collection permit and a construction construction <br /> Memarandum of Understanding with CDFG allowing the activities contractor and <br /> biologist to handle and collect bats)shall be conducted prior to any <br /> tree removal or demolition activities. If no bats are detected, then subcontractor(s) <br /> no further surveys are required. However, if bats are detected in a <br /> tree or structure on the site, the bats shall be passively <br /> excluded/evicted from the roost area for two consecutive days. <br /> Tree removal and/or demolition shall occur not less than the day <br /> following the two consecutive days of exclusion/eviction. <br /> Less Than Significant Impact with Mitigation <br /> Finger Avenue Nine-Lot Planned Development Project June 2012 <br /> Mitigation Monitoring or Reporting Program Page 10 <br /> RESO.#15217 <br /> MUFF#613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.