09/10/2012 <br /> MITIGATION MONITORING OR REPORTING PROGRAM <br /> FINGER AVENUE NINE-LOT PLANNED DEVELOPMENT PROJECT <br /> Responsibility <br /> Impact Mitigation Timeframe for for Oversight of <br /> Implementation Implementation Implementation <br /> AIR QUALITY <br /> The generation of dust Mitigation Measure AIR-1: The proposed project includes the During all phases Project applicant City's Building <br /> and other particulate following construction practices to reduce construction dust/air of construction. and contractors Official <br /> matter could during all phases <br /> quality impacts to a less than significant levei: <br /> temporarily impact . All exposed surfaces(e.g. parking areas, staging areas, of construction <br /> nearby sensitive <br /> receptors. soil piles, graded areas, and unpaved access roads)shall <br /> be watered two times per day. <br /> • All haul trucks transporting soil, sand, or other loose <br /> mate�ial offsite shall be covered. <br /> • All visible mud or dirt track-out onto adjacent public <br /> roads shall be removed using wet power vacuum street <br /> sweepers at least once per day. The use of dry power <br /> sweeping is prohibited. <br /> • Sweep daily(with water sweepers)all paved access roads, <br /> parking areas and staging areas at construction sites. <br /> • All vehicle speeds on unpaved roads shall be limited to 15 <br /> mph. <br /> • All roadways, driveways, and sidewalks to be paved shall <br /> be completed as soon as possible. <br /> • Building pads shall be laid as soon as possible after <br /> grading unless seeding or soil binders are used. <br /> • Idling times shall be minimized either by shuttir�g <br /> equipment off when not in use or reducing the maximum <br /> idling time to five minutes(as required by the California <br /> airborne toxics control measure Title 13, Section 2485 of <br /> California Code Regulations [CCR]). Clear signage shall <br /> be provided for construction workers at all access points. <br /> Finger Avenue Nine-Lot Planned Development Project June 2012 <br /> Mitigation Monitoring or Reporting Program Page 16 <br /> RESO.#15217 <br /> MUFF#613 <br />