My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res12 15217
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2012
>
Res12 15217
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2012 11:09:45 AM
Creation date
9/17/2012 11:08:08 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
osn oi2o�2 <br /> Construction Mitigation Measure HAZ-2: The primary contractor responsible The safety plan Project applicant City's Building <br /> activities would shall be approved and primary Official <br /> include the temporary for construction shall prepare a safety plan. The safety plan shall prior to the start contractor <br /> and short-term include measures to reduce and minimize accidents on-site of construction <br /> transport and activity on the <br /> (housekeeping), and measures that address the proper procedures <br /> handling of various site and <br /> construction materials to clean up and contain spills. The safety plan shall be approved implemented <br /> that are classified as by the City's Building Department prior to the start of during all <br /> hazardous materials construction activity on the site. construction <br /> (e.g., diesel fuel, oil, activity <br /> gasoline, and Less Than Significant Impact with Mitigation <br /> architectural <br /> coatings). <br /> MITIGATION MONITORING OR REPORTING PROGRAM <br /> FINGER AVENUE NINE-LOT PLANNED DEVELOPMENT PROJECT <br /> Responsibility <br /> Impact Mitigation Timeframe for for Oversight of <br /> Implementation Implementation Implementation <br /> NOISE <br /> Noise generating During all phases Project applicant Director of <br /> Mitigation Measure NOI-1: <br /> activities associated of construction and contractors Planning <br /> with demolition and a. Limit construction to daytime hours (7:00 AM to 8:00 during all phases <br /> construction at the PM)Monday through Friday, with no construction of construction <br /> project site would activities on weekends or holidays per Section 24.32 of <br /> tempararily elevate the City of Redwood City Municipal Code. <br /> noise levels in the area <br /> surrounding the b. Construction activities or equipment shall not generate <br /> project site. <br /> noise levels exceeding 110 dB(A)per Sec. 24.31 of the <br /> City of Redwood City Municipal Code. <br /> c. Utilize"quiet" models of air compressors and other <br /> stationary noise sources where technology exists. <br /> Finger Avenue Nine-Lot Planned Development Project June 2012 <br /> Mitigation Monitoring or Reporting Program Page 19 <br /> RESO.#15217 <br /> MUFF#613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.