6.3.A. - Page 1 <br /> RE PO RT <br /> To the Honorable Mayor and City Council <br /> From the Cit Mana er <br /> September 24, 2012 <br /> SUBJECT <br /> Final Acceptance-Stulsaft Park Road Repairs <br /> RECOMMENDATION <br /> Accept, by motion, the Stulsaft Park Road Repairs Project and authorize the release of <br /> bonds and retention according to city procedures. <br /> BACKGROUND <br /> On January 9, 2012, Council awarded the construction contract for the Stulsaft Park <br /> Road Repairs to the lowest responsive and responsible bidder, McNabb Construction, <br /> Inc. of Lafayette, for $107,828. <br /> ANALYSIS <br /> Stulsaft Park is a 42-acre regional natural park in Redwood City that has gravel and dirt <br /> maintenance and fire roads. This project widened and re-graded three areas of the <br /> roadway where erosion had occurred. Three different methods were used to widen the <br /> roadway including, cutting back the hillside, installing soldier piles and lagging retaining <br /> wall and constructing a keystone retaining wall. <br /> The Stulsaft Park Road Repairs Project was successfully completed in accordance with <br /> the plans and specifications and within the time allowed for a total contract cost of <br /> $118,341.30. Change orders were issued for a total of $10,513.30 which included bid <br /> item quantity adjustments for the soldier pile and lagging retaining wall, the keystone <br /> wall and the roadway widening; and for modifying the chain link fencing. The changes <br /> represented 9.75% of the original contract amount of $107,828. <br /> The project was substantially completed on August 29, 2012 and the roadway was <br /> reopened to the public. <br /> ALTERNATIVES <br /> Council may choose not to accept the project, or authorize the release of bonds and <br /> retention which would be contrary to the terms of the contract and prior Council action. <br />