My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-10-08
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-10-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 2:44:22 PM
Creation date
10/4/2012 4:59:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
10/8/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.B. - Page 12 <br /> ❑ Site plan <br /> ❑ De�efopment area and uses <br /> C Si#e access, circulation, and parking <br /> ❑ Urban design, architectural themes, massing, building design, potential <br /> sustainable design fieatures, and materials <br /> ❑ Ameni#ies such as lanc4scaping, ligh#ing, signage, and open space <br /> ❑ Utilities <br /> • Phasing and construckion scenario <br /> • Project approvals and er�titlements <br /> Consultanf Deliverables: A draft of the Project Description that incorporates comments <br /> from the City. <br /> City Mvvlvement: Participate in �arojec# descrip#ion meetmgs and data c�llection effarts. <br /> Review and appro�e Project Description. <br /> Task 3.,Prepara#ion of Administrati�e Draft initial Stud� <br /> Purpose: Cansultar�t will synthesi�e background information for use in the existing <br /> setting, and evaluate changes to those baseline conditions resulting from implementation <br /> of the proposed project. If apprapriate, Consultan# will present mitigation measures for <br /> any identified potentially significant effects. Consultant will prepare Administrative Draft IS <br /> to determine if subsequent CEQA review is required. <br /> Discussion: This scope outlines the proc�ss and analysis for completion ot an IS. If tt�e <br /> IS ilfustrates that no signifcant physical en�ironmenfal impacts wauld result, then an <br /> Initial Study/Mitigated Nega#iv� Declaration (fSIMND) would be the apprapriate CEQA <br /> document and the tasks in�ol�ed will be similar ta what is included b�law. If an 151MND is <br /> the appropriata CEQA dacument, then the 1S can easily be co��erted to the ISIMND <br /> format. <br /> However, if significant and unavoidable environmental impacts would result, then an <br /> En�ironmental Impact Report (EIR) would be required and the 15 would deter the major <br /> environrnental analysis #o the EIR. If an EIR is required, Consultant will submit a <br /> separate scope of work and budget for review by the City. <br /> For this #ask, Consultant will be respansible far the following tour principal activities: <br /> • Establish baseline conditions; <br /> • Perform the analysis and make determinations of impact significance; <br /> • Recommend mitigation measures ta reduce impacts, if needed; and <br /> � Determine the subseq�ent CEQA analysis. <br /> For each environmental tapic, Cansultant will analyze significance thresholds based �n <br /> CEQA Guidelines, Appendix G. The analysis wiil be based �n standard methodalogies <br /> and techniques, and will focus an the �ef changes anticipated a#t�te praject si#e. <br /> Aesthetics <br /> Consultar�t will conduct the foNowing tasks to cornpiete the Aesthetics anafysis: <br /> AT'fYlAGRl2012.154/24 HOUR COIVTRACT/ATKfNS NORTH AMERICA <br /> REV:09-19-12 JS <br /> Page 10 of 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.