My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-10-08
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-10-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 2:44:22 PM
Creation date
10/4/2012 4:59:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
10/8/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.C. - Page 13 <br /> f. Coordinate with Redwood City on the western alignment and connection <br /> between the undercrossing and Convention way <br /> g. Provide support for the dry utility relocations within project limits <br /> h. Develop a lighting layout, landscaping plan, and irrigation plan for the path <br /> i. Electrical engineering consultant shall design a warning system (i.e. call boxes, <br /> flashing beacon, etc.) <br /> j. As needed during design, attend meetings with Caltrans, SBSA, PG&E, AT&T <br /> and Redwood City. Redwood City staff shall attend all meetings the consultant <br /> schedules with other agencies. Consultant shall present the preliminary plans to <br /> the agencies to ensure compliance with agency regulations and establish <br /> necessary steps needed to obtain permits. <br /> k. Prepare wall type selection report <br /> I. Prepare CEQA/Environmental clearance <br /> m. Provide support for the edge (slope) treatment/regulatory permitting efforts <br /> n. Prepare preliminary construction cost estimates <br /> Plans are to be prepared using AutoCAD software and design will be in <br /> accordance with current Federal and State design standards, California MUTCD <br /> guidelines, and the City of Redwood City's design standards. <br /> Deliverables: Public presentation exhibits, five hard copy sets of plans and .pdf's of the <br /> plans and cost estimates, five hard copies of the Geotechnical design report, five hard <br /> copies of the technical study reports and final mitigated negative declaration (MND), <br /> fifteen MND Summary Form with 15 cds of full MND for submittal to the State (CEQA <br /> requirement) <br /> Task 4 — Public Outreach <br /> Consultant shall: <br /> a. Assist City to develop informational flyers and handouts for up to 2 outreach <br /> meetings with the community. Consultant shall attend the community meetings. <br /> Deliverables: Informational flyers to advertise the meeting, handouts for the meeting, <br /> and color renderings of conceptual designs for discussion purposes. Provide a <br /> summary of ineeting comments. <br /> Task 5— Construction Documents <br /> Consultant shall: <br /> a. Coordinate with City staff for two plan check reviews by Redwood City, Caltrans, <br /> SBSA, and other appropriate permitting agencies. If requested by the City, <br /> Consultant shall be available to meet to discuss and review comments. <br /> b. Prepare permit application and exhibits for work within Caltrans right-of-way on <br /> behalf of the City. <br /> ATTY/AGR/2012.151/WRECO <br /> REV:09-27-12 JS <br /> Page 11 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.