6.1.C. - Page 18 <br /> Proposal for Engineering Design Services for 101 Pedestrian Crossing <br /> Project Team <br /> Subtotal Subtotal <br /> Task Task Description Fee Hours <br /> PHASEI <br /> 1 PROJECT KICK-OFF <br /> Field Review $ 2,664.00 24 <br /> Review Existing Documents $ 2,450.00 22 <br /> ConstructabilityMeetingw/Contractor $ 1,984.00 12 <br /> Kickoff Meeting $ 5,438.00 37 <br /> ProjectSchedule $ 290.00 2 <br /> Subtotal $ 12,826.00 97 <br /> 2 TOPOGRAPHICAL SURVEYING/UTILIN RELOCATION <br /> PotholingofExistingUtilities $ 680.00 4 <br /> SupplementalTopographical5urvey $ 690.00 6 <br /> Utility Mapping,As-built Research $ 204.00 2 <br /> Supplemental Control Surveys and Mon.Ties $ 2,250.00 14 <br /> Design Topo and Topo Reduction $ 3,660.00 20 <br /> Record ROW Plotting,Exhibit Drafting,QA/QC $ 1,150.00 10 <br /> Subtotal $ 8,634.00 56 <br /> 3 PRELIMINARY DESIGN <br /> Develop Design Base Map $ 705.00 7 <br /> Geotechnical Investigation and Design Report $ 13,670.00 109 <br /> Coordination with City on Alignment $ - 0 <br /> Design Team Meetings(2) $ 1,828.00 12 <br /> Preliminary Plans $ 26,246.00 226 <br /> Design Concept Meeting with the City(1) $ 1,404.00 10 <br /> Coordination Meetings with Caltrans(2) $ 2,028.00 16 <br /> Coordination Meetings with Utility Companies(2) $ 1,380.00 12 <br /> CEQA/Environmental Clearance $ 39,150.00 427 <br /> Provide Support for Permitting Effort $ 4,580.00 44 <br /> Prepare WaII Type 5election Report $ 2,847.00 17 <br /> Prepare Preliminary Cost Estimate $ 1,420.00 12 <br /> Subtotal $ 95,258.00 892 <br /> Phase I Subtotal $ 116,718.00 3045 <br /> PHASEII <br /> 4 PUBLICOUTREACH <br /> Provide Informational Flyers $ 4,293.00 41 <br /> Provide Color Renderings $ 2,324.00 21 <br /> Public Outreach Meeting(2) $ 4,594.00 36 <br /> Subtotal $ 11,211.00 98 <br /> 5 CONSTRURION DOCUMENTS <br /> 5.1 65%Plans $ 32,915.00 315 <br /> 65%Specifications $ 6,027.00 50 <br /> 65%Cost Estimate $ 2,885.00 27 <br /> 65%Drak SWPPP $ 4,200.00 40 <br /> Internal QA/QC $ 1,960.00 12 <br /> 5.2 95%Plans $ 23,211.00 221 <br /> 95%Specifications $ 7,825.00 65 <br /> 95%Cost Estimate $ 2,443.00 22 <br /> 95%SWPPP $ 2,860.00 28 <br /> Prepare Drak Caltrans Encroachment Permit $ 1,380.00 12 <br /> Internal QA/QC $ 1,960.00 12 <br /> 5.3 100%Plans $ 17,211.00 161 <br /> 100%Specifications $ 4,485.00 37 <br /> 100%Cost Estimate $ 2,153.00 20 <br /> 100%SWPPP S 1,810.00 18 <br /> Update Caltrans Encroachment Permit $ 1,380.00 12 <br /> Internal QA/QC $ 1,380.00 8 <br /> Review Meetings with City(2) $ 1,628.00 12 <br /> Subtotal $ 117,713.00 3072 <br /> 6 CONSTRUCTION SUPPORT <br /> Prepare Responses to RFIs $ 4,765.00 36 <br /> Construction Kick-off Meeting $ 814.00 6 <br /> Conduct Site Visits(5) $ 11,026.00 94 <br /> Review Shop Drawings/Change Orders $ 2,417.00 19 <br /> Prepare Final Review/Punchlist $ 1,584.00 12 <br /> Prepare Record Drawings $ 2,474.00 24 <br /> Subtotal $ 23,080.00 191 <br /> Phase II Subtotal $ 152,004.00 1361 <br /> OTHER DIRER COST <br /> Travel $ 500.00 <br /> Reproduction $ 5,000.00 <br /> Drilling Permits $ 900.00 <br /> Drillingand5ampling $ 3,800.00 <br /> LaboratorySoilTesting $ 1,100.00 <br /> HazardousMaterialTesting&Reporting $ 2,000.00 <br /> Potholing(6 Locations) $ 3,804.00 <br /> ODC Subtotal $ 17,304.00 <br /> Total Project Cost $285,826.00 2406 <br /> $ 285,826.00 <br /> ATTY/AGR/2012.151/WRECO <br /> REV:09-27-12 JS <br /> Page 16 of 16 <br />