My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 WRECO
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 WRECO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2022 10:27:47 AM
Creation date
10/17/2012 12:28:38 PM
Metadata
Fields
Template:
Agreement
Contractor Name
WRECO
PROJECT NAME
Design Professional Agreement US 101 pedestrian undercrossing project
RMP File Number
304
Date
10/17/2012
MO Ref
12-189. 13-003, 13-213, 18-197
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_ <br /> � <br /> EXHIBIT "A" <br /> SCOPE OF SERVICES AND FEE SCHEDULE <br /> This Amendment revises the scope and fee of the Agreement as follows. <br /> SCOPE OF SERVICES: <br /> 1. Consultant shall revise the civil design to incorporate steel railings on top of the creek <br /> side wall and raise the profile of the joint-use path under U.S. Highway 101. <br /> 2. Consultant shall revise the civil design to utilize the power from the Bair Island Road <br /> Storm Drain Pump Station Relocation Project for the electrical components of the joint- <br /> use path under U.S. Highway 101. <br /> 3. Consultant shall prepare easement dedication documents for the joint-use path. <br /> 4. Consultant shall prepare a cathodic protection design for the steel micropiles. <br /> Project Team <br /> Subtotal Subtotal <br /> Task Task Description Fee Hours <br /> PHASE ll <br /> 5 CONSTRUCTION DOCUMENTS <br /> 5.2 Revise design ta steel railing and raise profile of path $ 10,762.00 89 <br /> Revise desigr�to utilize the storm drain pump station power $ 3,838.00 30 <br /> Easement dedication documents $ 4,540.00 38 <br /> Corrosion protection design $ 980.00 8 <br /> Subtotal $ 20,120.00 165 <br /> Phase II Subtota) $20,120.00 165 <br /> OTHER DIRECT COST <br /> Cathodic Protection Design $ 9,500.00 <br /> Title Report $ 450.00 <br /> Other Direct Cost Subtotal $ 9,950.00 <br /> Total Amendment No. 2 Cost $30,070.00 <br /> REV:11-18-13 VR <br /> Page 3 of 3 <br /> ATTY/AGR.Amend No.2/WRECO/AMEND NO.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.