Laserfiche WebLink
(. CE&G <br /> Schedule of Charges 2017 <br /> 1. Professional Services. These are "all-up" rates, and include direct salary cost, overhead, general and administrative costs <br /> not separatelyaccounted for,and profit <br /> Personnel 2017 Rates/Units <br /> Principal Engineer/Geologist $ 225 per hour <br /> Associate Engineer/Geologist $ 200 per hour <br /> Senior Engineer/Geologist $ 184 per hour <br /> Project Engineer/Geologist $ 147 per hour <br /> Staff Engineer/Geologist $ 131 per hour <br /> Technician (Straight rate prevailing wage) $ 118 per hour <br /> GIS/CADD Specialist $ 110 per hour <br /> Project Assistant $ 84 per hour <br /> Administration/Clerical $ 79 per hour <br /> Special Inspector (Straight rate prevailing wage; no 4-hr min) $ 121 per hour <br /> Deposition/Court Testimony (minimum 4 hours) $ 370 per hour <br /> Field and Laboratory Tests 2017 Rates/Units <br /> Concrete Compressive Strength Testing $ 36 per cylinder <br /> Moisture Content (ASTM D 2216) $ 21 per test <br /> Moisture & Density (ASTM D 4318) $ 28 per test <br /> Atterberg Limits (ASTM D 4318) $ 185 per test <br /> Compaction Curve, 4" mold (ASTM D 1557) $ 235 per test <br /> Compaction Curve, 6" mold (ASTM D 1557) $ 290 per test <br /> Wash over #200 Sieve (ASTM D 1140) $ 65 per test <br /> Sieve Analysis with #200 Wash (ASTM D 422) $ 135 per test <br /> Sieve & Hydrometer (ASTM D 422) $ 210 per test <br /> Reimbursables 2017 Rates/Units <br /> Mileage (per allowable federal) $ 0.55 per mile <br /> Nuclear Gage $ 52 per day <br /> Inclinometer $ 179 per day <br /> Vane Shear Device $ 103 per day <br /> 2. Travel Time. Travel time will be charged at regular hourly rates, not to exceed eight (8) hours per day. <br /> 3. Expenses. All direct costs will be billed at actual cost plus 10%,unless there is explicit agreement otherwise. Direct costs <br /> include: <br /> • Third party services—Fees for subcontracted third party services (including drilling and backhoe services,special <br /> consultant fees, permits, special equipment rental, overnight mail or messenger services and other similar project <br /> related costs) <br /> • Travel expenses, including airfares, hotel, meals, ground transportation, and miscellaneous expenses. <br /> • Reproduction costs, including photocopy, blueprints, graphics, photo prints or printing. <br /> 4. Subconsultants. To the extent that it becomes necessary to use subconsultants, Client will be invoiced at cost plus 10% <br /> to cover insurance liability and other overhead costs. <br /> S. Accounting. The cost of normal accounting services forinvoicing has been considered in the overhead expense which is <br /> included in the above hourly rates. Additional requirements for invoice verification,such as copies of time sheets, detailed <br /> expense records, and supplemental daily work justification will be billed on an hourly basis. <br /> Pragmatic Expect/se <br /> ATTY/AGR.Amend No. 3 /Wreco - US 101 UC <br />