Laserfiche WebLink
� � <br /> EXHIBIT "A" <br /> SCOPE OF SERVICES AND FEE <br /> Task 3.0 Administrative Draft IS/MND II, Screencheck Draft, Public Draft and Noticing <br /> 1. Traffic Study(Hexagon Transportation Consultants, Inc. — Sub-Consultants) <br /> Sub-Consultant completed a draft traffic study for the proposed 24 Hour Fitness Project <br /> in Redwood City in December 2012. In accordance with the originally executed <br /> contract, the background traffic scenario was based on the background scenario in the <br /> Stanford in Redwood City Draft EIR. Because of the magnitude of traffic growth in the <br /> Stanford background scenario, the decision has been made to use a different approach <br /> for the 24 Hour Fitness Project's traffic study. Sub-Consultant will revise the <br /> background scenario to include only trips from a list of approved projects. This different <br /> approach will require recalculation of the background and background + project <br /> scenarios, revisions to the findings of impacts and mitigation measures, and revisions to <br /> the original tra�c report. The cost for these revisions will be based on staff time, not to <br /> exceed $2,400. The revisions will take one week to complete. Sub-Consultant will <br /> require descriptions, and ideally traffic studies, for the projects on the approved list from <br /> the City. <br /> Consultant will incorporate changes made to the traffic study by Sub-Consultant into the <br /> Transportation/Traffic section of the revised IS/MND as follows: <br /> 8 hours x $125/hr(Project Manager) _ $1,000.00 <br /> Subtotal = $3,640.00 (includes Consultant's 10% administration fee ($240.00) for Sub- <br /> Consultant's work. <br /> 2. Air Quality and Greenhouse Gas Emissions Re-Modeling and Analysis <br /> Based on revision to the traffic study (as outlined under item 1 above), Consultant's air <br /> quality/GHG analyst will re-run the CaIEEMod model based on the revised traffic and <br /> building size assumptions. Consultant shall also potentially re-run the Caline4 model is <br /> there are any revisions in traffic that change intersection volumes. Consultant will re- <br /> design/re-run the AERMOD model to separate out the individual construction phases, <br /> and review and revise the air quality and GHG sections of the IS/MND to incorporate <br /> the new modeling results. The revisions to the air quality and GHG analyses will take <br /> one week to complete. The time outlined below also accounts for senior review of the <br /> analyses, as well as a conference call to discuss the results. <br /> 48 hours x $125/hr(Associate Project Manager) _ $6,000.00 <br /> 2 hours x $180/hr(Project Director) _ $360.00 <br /> Subtotal = $6,360.00 <br /> ATTY/AGR/2013/AMENDMENTS/AMEND NO.1 24 HOUR FITNESS ATKINS <br /> REV:02-14-13 VR <br /> Page 3 of 4 <br />