My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-10-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-10-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 2:46:19 PM
Creation date
10/18/2012 3:58:58 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
10/22/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 2 <br /> Because these maintenance projects remove pavement markings during the course of <br /> the project, they provide an opportunity to modify the roadway layout for only the cost of <br /> any additional striping and signage. <br /> ANALYSIS <br /> Farm Hill Boulevard and Jefferson Avenue were last resurfaced in 2004. As part of the <br /> City's routine pavement maintenance program both streets are scheduled to receive a <br /> slurry seal to extend the life of the pavement. Both streets are characterized as <br /> "connector streets" in the General Plan; connector streets are those in which <br /> automobiles, transit, bicycles and pedestrians are accommodated equally. <br /> In light of the General Plan's direction, and the opportunity provided by an upcoming <br /> slurry seal project — staff evaluated the feasibility of removing a lane of traffic <br /> (converting an undivided, 4-lane street to a street with 3 lanes and bike lanes — see <br /> Figures 2 and 3) on Farm Hill Boulevard and Jefferson Avenue between the western <br /> city limit and Alameda de Las Pulgas (see Figure 1). <br /> Technical Issues: <br /> Converting an undivided, 4-lane street to a street with 3 lanes and bike lanes is one of <br /> the most effective engineering changes to achieve the goals of enhancing safety and <br /> livability for residents, visitors, and commuters. A three-lane configuration: <br /> • Increases safety for drivers by reducing the number of conflict points and <br /> improving sightlines <br /> • Improves traffic operations by putting left-turning vehicles in a dedicated lane <br /> • Reduces speeding by allowing the prudent driver to set the prevailing speed <br /> • Simplifies crossings by people driving and walking by reducing the number of <br /> lanes that have to be crossed <br /> • Shortens the amount of time people walking are exposed to traffic and eliminates <br /> multiple-threat collisions <br /> • Provides dedicated space for people riding bicycles <br /> Figure 1: Existing, 4-Lane Configuration (typical) <br /> �A'� ���� � ���'� ��-�� ��� <br /> . { . <br /> r �1� � � � . � } �_i <br /> r�..RI4: � � � � r�%'IiJ.i <br />
The URL can be used to link to this page
Your browser does not support the video tag.