Laserfiche WebLink
On Broadway <br />Demolition and Utility Relocation Phase <br />Amendment # 1 <br /> <br />Based on Bids Received from Developer/Contractor an increase in cost <br />is necessary to complete work to relocate the existing private utilities <br /> (PG&E, SBC and MCI) and the public utilities (water, sewer, and storm pipe) on <br /> Middlefield Road between Winslow and Broadway. <br /> <br /> Item Description Original Budg~ New Budget Add'l Req. <br /> <br /> 3 Relocate Waterline $61,000.00 $113,000.00 $52,000.00 <br /> 4 Relocate Sewer line $52,000.00 $57,000.00 $5,000.00 <br /> 5 Install Joint Trench $300,000.00 $375,000.00 $75,000.00 <br /> Subtotal $132,000.00 <br /> Contingency (10%) $13,200.00 <br /> Subtotal $145,200.00 <br /> Developer's fee (5%) $7,260.00 <br /> Rounded (say) $150,000.00 <br /> <br /> Exhibit A <br /> <br /> <br />