Exhibit "C" <br />` Exceptions and Clarifications <br />\~-~ On Broadway -Garage <br />Redwood City, CA <br />November 8, 2004 <br />SCOPE OF WORK FOR THE GARAGE INCLUDES all construction work per the updated <br />drawing log (Exhibit B) with the following exceptions and clarifications: <br />1. All Change Order Requests previously incorporated into the contract via Change Orders <br />1, 2, 3 and 4 are included in the scope of work as described in those change documents. <br />2. Change order requests 20 (Paystation Locations), 38 (Culvert Demolition Delay), 52 <br />(Over Excavation) and 81 (Pilaster Tops per RFI's 101 & 103) are included as described <br />in those Change Request documents. <br />3. Interior walls will be grey, smooth faced, 8" x 8" x 16" light weight blocks, reinforced and <br />in-filled. A miscellaneous steel connection will be used at the wall to ceiling intersection <br />similar to detail 12/A5.02 of the contract documents, dated 6-1-04. <br />4. signage will be per Contract Documents, except for sheets A10.02, A10.03, A10.04 & <br />A10.05 dated 6-1-04 which have been revised by International Parking Design by hand <br />on 7-8-04. <br />5. Podium Level Beams will be trowled on smooth finish fireproofing unless not approved by <br />structural engineer. <br />6. Stair Railing to be per alternate five tube detail as provided by International Parking <br />Design as clarified in RFI #110. <br />7. Conduit for data lines to lot 2 and City Hall will include two, one inch conduits from the <br />attendant's office to Jefferson Street and to Middlefield Road (4 conduit runs total). <br />These conduits will be run in the slab to five feet outside garage building line. Junction <br />boxes and connections outside the building to be by others. <br />8. Cameras and video recording equipment will be provided as follows: Camera coverage <br />will be provided at each exit to the garage and at code blue stations. Conduit and <br />junction boxes for future cameras to increase coverage areas will also be provided per <br />previously approved Change Order Request #45. <br />9. Transformer room configuration will be per Bulletin #1 as issued by International Parking <br />Design, dated 8-30-04 with associated structural drawings from DES Architects + <br />Engineers dated 8-30-04. <br />10. Furnishing, installation and hook up of parking management equipment is EXCLUDED <br />11. Fire Hydrant and underground fire water work in the value of $ 44,271 will be done as <br />part of the Streetscape work. <br />12. Fire Hose Bib Locations are located in garage stair cases and at the base of the vehicle <br />ramps at each level per the request of the fire marshal. <br />13. Dewatering & Filtration System: System is included per Fugro West Inc. design <br />documents dated July 29, 2004. <br />14. Cost of operation and maintenance of the groundwater treatment system as detailed in <br />Fugro West Inc.'s October 15, 2004 proposal is EXCLUDED. <br />15. Document Reproduction Costs: Scope includes reproduction costs of construction <br />documents for General Contractor and Subcontractors anticipated from the date of this <br />document moving forward. Reproduction Costs for any added scope by the City of <br />Redwood City or Developer is EXCLUDED. <br />16. All exterior signage including "garage full" sign (sign #46 on sign schedule -sheet <br />A10.02) is EXCLUDED. All structural support and power for exterior signage is <br />EXCLUDED. <br />1 of 1 <br />