My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt87 Browning Ferris BFI
RedwoodCity
>
City Clerk
>
Agreements
>
1980-1989
>
1987
>
Agmt87 Browning Ferris BFI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:34:35 PM
Creation date
1/12/2004 11:49:31 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Browning Ferris BFI
PROJECT NAME
South Bayside Transfer Station Authority Franchise
RMP File Number
702-02 bin 12
Date
9/28/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Audit Review <br /> <br />The auditors should issue their audit report no later than <br />November 30 of each year (see Exhibit III). Prior to the issu- <br />ance of their report, the SBTSA and their consultants should meet <br />with the auditors to review the results of the audit as dooumen- <br /> <br />ensure that: <br /> <br /> o The audit work performed was consistent with the audit plan <br /> reviewed by the SBTSA; and <br /> <br /> o The scope, including any revisions due to errors or <br /> weaknesses discovered during the course of the audit, was <br /> adequate. <br /> <br />This meeting should take place as soon as possible after the <br />close of the audit fieldwork so that any additional testing which <br />may be required can be performed without delaying the rest of the <br />rate setting process. <br /> <br /> 7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.