Laserfiche WebLink
12/03/2012 <br /> EXHIBIT "C" <br /> SCHEDULE OF HOME IMPROVEMENTS <br /> Year One (2012) <br /> - Porch restoration (wood) baluster and appropriate railing along step repair. <br /> (Completed as of 1/20/2412) <br /> - Existing window repairs and restoration. (Completed as o#2/25/2Q12) <br /> - Remove all abandnned electrical, gas raceways and unused exterinr-mounted <br /> equipment. (Campleted as of 2I25/2012) <br /> - New painting (nutside and original doors) (Completed as of 2/25/2012) <br /> - Driveway treatment: partial concrete driveway (Completed as 4/10/2012) <br /> Year Two (2013) <br /> - Screening the new meter with a narrow vertical shrub <br /> - Landscaping <br /> Year Three to Five (2014-2016) <br /> - Replace existing fences, together with neighbars. (The left side would be Iikely <br /> be done on 2012) <br /> - New roof and gutter for the front structure <br /> Year Six to Ten l2017-2022) <br /> - Prune palm tree. <br /> - prune all deciduous trees (those that drop leaves). <br /> ATTY/AGR/2012.185/726/728 BREWSTER MILLS ACT CONTRACT <br /> REV:11-15-12 VR <br /> Page 9 of 70 <br /> RESO. # 15236 <br /> MUFF#612 <br />