My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 E2 Consulting Engineers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Under 60K
>
Agmt12 E2 Consulting Engineers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2012 2:34:32 PM
Creation date
12/5/2012 2:34:31 PM
Metadata
Fields
Template:
Agreement
Contractor Name
E2 Consulting Engineers, Inc.
PROJECT NAME
Install and monitor 6 flow meters in wastewater collection system.
RMP File Number
304.5
Date
12/4/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> EXHIBIT "B" <br /> FEE SCHEDULE <br /> The following table is an estimate of the cost of Consultant's Services. <br /> E2 <br /> E2 Field Office <br /> Task E2Manager Leader FieldTech Tech OCD Totals <br /> $135 $70 $65 $55 <br /> Task 1-Pre-mon�oring Inspection <br /> 1.1-Site visit $810 $42D $0 $0 $270 $1,500 <br /> 1.2-Develop Work Plan(health and safety) $270 $0 $0 $110 $0 $380 <br /> 1.3-Meter selection memo Desi n Su6mittals $135 $0 $D $0 $0 $135 <br /> Task 2—Flow Meter Instillation <br /> 2.1— Install Flowmeter $135 $560 $1,040 $0 $200 $1,935 <br /> 2.2-Collectfieldcalibrationpoints"profileflovd' $0 $560 $1,040 $0 $9,600 $11,200 <br /> 2.3—Trouble shoot field prohlems $0 $280 $520 $0 $20D $1,000 <br /> 2.4— removemeters $135 $560 $1,040 $0 $200 $1,935 <br /> I <br /> Task 3—Rainfall Monitoring <br /> 3.1—Install 3 rain gauges $540 $280 $0 $0 $10 $830 <br /> Task 4—Flow and Rainfall <br /> 42—Weekly review of down�oaded data $810 $t,6B0 $2,275 $440 $1,400 $6,605 <br /> Task 5—Data Reporting <br /> 5.1—Final report to Client $3,240 $D $78D $0 $0 $4,020 <br /> Task 6-Project management <br /> 6.1-Kick off mee6ng $54D $0 �0 $0 $0 $540 <br /> 62-Progress meeting(4 meetings) $t,080 $0 $D $0 $0 $1,080 <br /> 6.3-ProjectAdministration $0 $0 $0 $165 $0 $165 <br /> Tokls $7,695 54,340 $6,695 $715 $11,880 531,325 <br /> Total Cost 6 meters of all Labor For Two Months 531,325 <br /> Opbonal month per meter $2,300.OD <br /> Extra meter per week $575 <br /> Total Cost 6 meters of all Labor For Three Months 545,125.00 <br /> All fees will be charged on a time and materials basis, commensurate with work completed, in <br /> accordance with the hourly fee schedule below: <br /> 1. E2 Manager: $135/hour <br /> 2. E2 Field Leader: $70/hour <br /> 3. Field Tech: $65 <br /> 4. Office Tech: $55 <br /> Cost of Consultant's services for monitoring and reporting for a two month period as set forth in <br /> Exhibit A (Tasks 1 through 6) shall not exceed $31,325.00. Additional monitoring services, if <br /> required, shall be provided by the Consultant for a cost not to exceed $13,800. <br /> ATTY/AGR/2012.187/E2 Consulting Engineers, Inc <br /> 11-21-12 VR <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.