Laserfiche WebLink
Scope of Services <br /> <br /> a. Algaecide: The lagoon management plan calls for the algaecide/bactericide <br /> EarthTec. EarthTec is approved for its Iow copper concentrations and <br /> bactericide properties. Waterworks staffing and equipment for chemical <br /> applications include the chemical EarthTec, boat with motor, spray <br /> equipment, one chemical applicator and one staff technician. <br /> <br /> b. Herbicide: The lagoon management plan calls for the herbicide REWARD. <br /> Reward was approved for the control of widgeon grass in the areas of the <br /> lagoon where the harvester is inefficient or unable to harvest the widgeon <br /> grass. Waterworks staffing and equipment for chemical applications <br /> include the chemical Reward, boat with motor, spray equipment, one <br /> chemical applicator and one staff technician. <br /> <br /> 3. ChemicalApplications at Neptune Beach: Chemical applications to the Neptune <br /> Beach Area require strict adherence to the communication protocol stipulated in <br /> the Draft Mana.qement Plan: Redwood Shores La.qoon (Revised July 2003), <br /> Section 5.3.3. "City Guidelines for Applying Aquatic Pesticides," in addition to <br /> notifying, Redwood City staff and the City's water quality testing consultant, Scott <br /> Cressey. <br /> <br /> a. Notification as to the intent to make chemical applications and posting of <br /> warning signs as per the Lagoon Management Plan giving the Redwood <br /> Shores Residents 24 hour Notice. <br /> <br /> 4. Waterworks will use a Qualified Licensed Applicator Category F, licensed by the <br /> Department of Pesticide Regulations when applying chemical treatments to <br /> Redwood Shores Lagoons. <br /> <br /> 5. Waterworks is responsible for maintaining current, appropriate licenses from the <br /> Department of Pesticides Regulations for all Waterworks employees assigned to <br /> apply chemicals to the Redwood Shores Lagoon. <br /> <br /> 6. Waterworks is responsible for keeping the City updated on the validity of pesticide <br /> applicator licenses for all employees assigned to apply chemicals to the Redwood <br /> Shores Lagoon. <br /> <br />F) EQUIPMENT LIST <br /> <br /> The following equipment will be dedicated to the Redwood Shores Lagoon <br /> Management Project. The dedicated equipment is as follows: <br /> <br /> a. 1-Eight Foot Cutting Head Aquatic Harvester. <br /> b. 1-Tilt/Conveyer Trailer for Transport of Harvester and Vegetation: <br /> c. 1-16' Fiberglass Chemical Application and Water Quality Monitoring boat. <br /> d. 1-Zodiac inflatable Chemical Application and Water Quality Monitoring boat <br /> for small lagoons. <br /> e. 1-Argo Amphibious Unit, for access to all lagoons. <br /> f. 1-Honda Chemical Application Spray unit. <br /> g. 1-SGA 20 Gallon Reward Spray unit. <br /> h. I-International Tractor for Transport of Harvester and Vegetation. <br /> i. 1-YSI 8000 Dissolved Oxygen and Salinity Meter. <br /> 14 of 18 <br /> <br /> <br />