Laserfiche WebLink
EXHIBIT "C" <br /> SCHEDULE OF HOME IMPROVEMENTS <br /> Note: The following renovation projects have already been completed by the current owners <br /> during the 2010-2012 period: replacement of 153 seats in the mezzanine balcony, upgrade of <br /> the electrical system, the addition of fire sprinklers, and the addition of architectural lighting. <br /> YEAR IMPROVEMENT <br /> 2013 Replace 321 fixed seats on orchestra floor <br /> 2014 Replace lobby carpet <br /> 2015 Replace flooring of orchestra pit <br /> 2017 Improve stainless steel display cases <br /> Have spire evaluated by a structural engineer <br /> 2018 Restore and replace the spire as necessary based on the structural engineer's <br /> evaluation <br /> 2019 Paint side and back of building <br /> 2020 Touch up facade paint as needed <br /> 2021 Update electrical power to marquee <br /> 2022 Replace 500 upper balcony seats <br /> ATTY/AGR/2012.184/FOX THEATRE MILLS ACT CONTRACT <br /> REV: 11-15-12 VR <br /> Page 9 of 10 <br />