Laserfiche WebLink
12/03/20 <br /> EXHIBIT "C" <br /> SCHEDULE OF HOME IMPROVEMENTS <br /> Note: The fo!lowing renovation projects have already been campleted by the currenf owners <br /> during the 2010-2012 period: repiacement of 153 seafs in the mezzanine ba/cony, upgrade of <br /> the e/ectrical system, the addition of fire sprinklers, and the addition of archifectura!lighting. <br /> YEAR IMPROVEMENT <br /> 2013 Replace 321 fixed seats on orchestra fioor <br /> 2014 Replace lobby carpet <br /> 2015 Repiace flooring of orchestra pit <br /> 201� Improve stainiess steel disp(ay cases <br /> Have spi�e evaluated by a structurai engineer <br /> 2018 Restore and replace the spire as necessary based on the structural engineer's <br /> evaluation <br /> 2019 Paint side and back of building <br /> 2020 Touch up facade paint as needed <br /> 2021 Update elec#rical power to marquee <br /> 2022 Replace 500 upper baicany seats <br /> ATTY/AGRl2�12.184/FOX THEATRE MILLS ACT CONTRACT <br /> REV:11-15-12 VR <br /> Page 9 of 10 <br /> RESO.#15235 <br /> MUFF#612 <br />